NYC OATH / ECB — Hearing Date Passed1 Brooklyn Bridge Park, Brooklyn, NY 11201 — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- 1 Brooklyn Bridge Park, Brooklyn, NY 11201
- Borough
- Brooklyn
- BIN
- 3000000
- Block/Lot
- 3/245/1001
- Hearing month
- August 2026
- Violation records on this page
- 6
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39189158P | August 5, 2026 10:30 AM | CLASS - 1 | Required inspection or equipment compliance issue | $10,000 |
| 35668592K | August 5, 2026 10:30 AM | CLASS - 1 | Work without permit | $12,500 |
| 39192893Z | August 26, 2026 8:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $2,500 |
| 39185150M | August 4, 2026 8:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $1,250 |
| 39193218J | August 26, 2026 9:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $2,500 |
| 39193219L | August 26, 2026 10:30 AM | CLASS - 2 | Exterior property or public-safety condition | $1,250 |
Property-specific hearing analysis for 1 Brooklyn Bridge Park, Brooklyn, NY 11201
This page focuses on 1 Brooklyn Bridge Park, Brooklyn, NY 11201 and the August 2026 OATH hearing records connected to that property. The public file lists 6 hearing records, with category work involving Required Inspection / Filing Compliance, Work Without Permit / Unapproved Construction, Failure to Maintain / Unsafe Condition, Certificate of Correction / Failure to Certify, Sidewalk / Curb / Public Way Condition.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 26, 2026, August 4, 2026, August 5, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $30,000. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
1 Brooklyn Bridge Park, Brooklyn, NY 11201 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Required Inspection / Filing Compliance strategy at this property
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
Inspection and filing problems can stay open even when the physical condition is resolved.
Work Without Permit / Unapproved Construction strategy at this property
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
Failure to Maintain / Unsafe Condition strategy at this property
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Certificate of Correction / Failure to Certify strategy at this property
This category generally means a required Certificate of Correction or proof of correction was not filed or accepted after a violation was issued.
A violation can remain open even after physical correction if the paperwork is not accepted.
Sidewalk / Curb / Public Way Condition strategy at this property
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39189158P — Required Inspection / Filing Compliance
Hearing dateAugust 5, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$10,000
Issue dateMay 19, 2026
Served dateMay 19, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “AT TIME OF INSPECTION OBSERVED EXPOSURE 2(LEFT) EXCAVATION FOR FOUNDATION SHORING APPROX. 20' AREA ADJACENT PROPERTY DAMAGED LARGE OPENING IN DRIVEWAY PAVERS APPROX. 15' CRACK WITH 1" OPENING & 20' OF REAR FENC” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
What a hearing on this record may have focused on
The hearing should focus on whether the inspection or filing was completed, whether it was accepted, and whether records can be produced.
Documents and proof worth reviewing now
- inspection reports
- filing confirmations
- service invoices
- repair photos
- accepted correction records
Why this should not be ignored
Inspection and filing problems can stay open even when the physical condition is resolved.
Cited law / infraction references- 109 BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Record 2: ECB Violation #35668592K — Work Without Permit / Unapproved Construction
Hearing dateAugust 5, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$12,500
Issue dateMay 23, 2026
Served dateMay 23, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “WORK WITHOUT PERMIT. NOTED A 9FT RETAINING WALL AT REAR EXP 2 SIDE OF LOT WAS CONSTRUCTED W/O PERMIT. PREVIOUS PERMIT #B00606272 TO REMOVE PART OF FORMER GARAGE AND REPAVE AREA DID NOT INCLUDE INSTALLATION OF N” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Permit history should be compared against the alleged work, approved plans, contractor invoices, and any restoration or legalization path.
What this category usually means
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
What a hearing on this record may have focused on
A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.
Documents and proof worth reviewing now
- before-and-after photos
- contractor records
- legalization or restoration proof
- permits
- approved drawings
Why this should not be ignored
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
Cited law / infraction references- 101 28-105.1 WORK WITHOUT A PERMIT
Record 3: ECB Violation #39192893Z — Failure to Maintain / Unsafe Condition
Hearing dateAugust 26, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 17, 2026
Served dateJune 17, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; NOTED, ATOI CONSTRUCTION TEMPORARY FENCE ON EXP. #1 OF ON LEFT SIDE HAVE FALL DOWN AND PUBLIC CAN CLIMB OVER THE FENCE MAY GET HURT., REPAIR AND/REPLACE” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.
Documents and proof worth reviewing now
- repair photos
- contractor invoices
- engineer or architect report
- permits
- inspection reports
Why this should not be ignored
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Cited law / infraction references- 102 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Record 4: ECB Violation #39185150M — Certificate of Correction / Failure to Certify
Hearing dateAugust 4, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateApril 20, 2026
Served dateApril 20, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39110415M AS OF 4/20/26., FILE A CERTIFICATE OF”
What this category usually means
This category generally means a required Certificate of Correction or proof of correction was not filed or accepted after a violation was issued.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on whether correction was completed, whether proof was submitted properly, and whether DOB accepted or rejected the certification.
Documents and proof worth reviewing now
- notarized statements
- permit sign-offs
- DOB rejection notices
- Certificate of Correction package
- photos
Why this should not be ignored
A violation can remain open even after physical correction if the paperwork is not accepted.
Cited law / infraction references- 263 AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Record 5: ECB Violation #39193218J — Failure to Maintain / Unsafe Condition
Hearing dateAugust 26, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 17, 2026
Served dateJune 22, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNERS; ATOI BUILDING HAVE PARTIALLY DEMO STATES WITH 1ST FLOOR ON THE LOT. ABANDON BUILDING HAS BEEN LEFT IN DISREPAIR, SEVERE STATES ON THE PREMISES WITH STRUCT” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.
Documents and proof worth reviewing now
- repair photos
- contractor invoices
- engineer or architect report
- permits
- inspection reports
Why this should not be ignored
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Cited law / infraction references- 102 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Record 6: ECB Violation #39193219L — Sidewalk / Curb / Public Way Condition
Hearing dateAugust 26, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 17, 2026
Served dateJune 22, 2026
What the source record says
The public description for 1 Brooklyn Bridge Park, Brooklyn, NY 11201 states: “TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. FENCE OR SIDEWALK SHED. EXIST PERMIT #321357660-01-EQ-FN HAVE EXPIRED AT 3/24/2017., RENEW PERMIT” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time. Curb or sidewalk issues may require DOT/DOB records and proof of restoration to legal condition.
What this category usually means
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
What a hearing on this record may have focused on
The hearing may examine the exact location, who performed the work, whether DOT/DOB permits existed, and whether restoration occurred.
Documents and proof worth reviewing now
- contractor invoices
- survey or sketch
- restoration proof
- DOT/DOB permits
- before-and-after photos
Why this should not be ignored
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
Cited law / infraction references- 207 BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Questions specific to this type of OATH hearing
What should be reviewed now for this required inspection / filing compliance record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Can this condition still be legalized or corrected after the hearing date?
Possibly. The correct path depends on the cited condition, current DOB/OATH status, zoning and code requirements, and whether restoration, legalization, professional filings, correction proof, or another agency process is now required.
What should be reviewed now for this failure to maintain / unsafe condition record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this certificate of correction / failure to certify record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search 1 Brooklyn Bridge Park, Brooklyn, NY 11201?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 1 Brooklyn Bridge Park, Brooklyn, NY 11201 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for 1 Brooklyn Bridge Park, Brooklyn, NY 11201?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440