NYC OATH / ECB — Hearing Date Passed111 Broadway, Brooklyn, NY 11249 — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- 111 Broadway, Brooklyn, NY 11249
- Borough
- Brooklyn
- BIN
- 3063669
- Block/Lot
- 3/2471/12
- Hearing month
- August 2026
- Violation records on this page
- 3
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39185813Y | August 28, 2026 8:30 AM | CLASS - 1 | Work without permit | $2,500 |
| 39185814X | August 28, 2026 8:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $2,500 |
| 39185815H | August 28, 2026 8:30 AM | CLASS - 1 | Work without permit | $2,500 |
Property-specific hearing analysis for 111 Broadway, Brooklyn, NY 11249
This page focuses on 111 Broadway, Brooklyn, NY 11249 and the August 2026 OATH hearing records connected to that property. The public file lists 3 hearing records, with category work involving Work Without Permit / Unapproved Construction, Failure to Maintain / Unsafe Condition, Stop Work Order / Continued Work.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, and hearing date information of August 28, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $7,500. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
111 Broadway, Brooklyn, NY 11249 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Work Without Permit / Unapproved Construction strategy at this property
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
Failure to Maintain / Unsafe Condition strategy at this property
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Stop Work Order / Continued Work strategy at this property
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
Continued-work allegations can carry substantial penalties and keep a project frozen.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39185813Y — Work Without Permit / Unapproved Construction
Hearing dateAugust 28, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateApril 23, 2026
Served dateApril 23, 2026
What the source record says
The public description for 111 Broadway, Brooklyn, NY 11249 states: “WORK WITHOUT PERMIT: ATOI OBSERVED CONSTRUCTION WORK ONLY 4TH FL APT( SIZE APPROX. 24FT L X 31FT W ). B101- STOPPING ALL WORK IN APT. PERMIT IS IN APPROVED STATUS, BUT NOT DISTRIBUTED., OBTAIN PERMIT”
What this category usually means
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
What a hearing on this record may have focused on
A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.
Documents and proof worth reviewing now
- before-and-after photos
- contractor records
- legalization or restoration proof
- permits
- approved drawings
Why this should not be ignored
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
Cited law / infraction references- 101 28-105.1 WORK WITHOUT A PERMIT
Record 2: ECB Violation #39185814X — Failure to Maintain / Unsafe Condition
Hearing dateAugust 28, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateApril 23, 2026
Served dateApril 23, 2026
What the source record says
The public description for 111 Broadway, Brooklyn, NY 11249 states: “OBSERVED FAILURE TO MAINTAIN IN 4TH FLOOR APT. FIRESTOPPING MISSING IN APARTMENT CEILING AND THROUGHOUT UNIT., PROVIDE/MAINTAIN FIRE STOPPING” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.
Documents and proof worth reviewing now
- engineer or architect report
- permits
- inspection reports
- repair photos
- contractor invoices
Why this should not be ignored
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Cited law / infraction references- 139 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
Record 3: ECB Violation #39185815H — Stop Work Order / Continued Work
Hearing dateAugust 28, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateApril 23, 2026
Served dateApril 23, 2026
What the source record says
The public description for 111 Broadway, Brooklyn, NY 11249 states: “PSWO - B101: PLUMBING WORK WITHOUT PERMIT, INCLUDING SHOWER INSTALLATION IN KITCHEN AREA AND BATHROOM WORK IN ORIGINAL BATHROOM LOCATION, IN 4TH FL APT ONLY., OBTAIN PERMIT” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
Cited law / infraction references- 101 28-105.1 WORK WITHOUT A PERMIT
Questions specific to this type of OATH hearing
Can this condition still be legalized or corrected after the hearing date?
Possibly. The correct path depends on the cited condition, current DOB/OATH status, zoning and code requirements, and whether restoration, legalization, professional filings, correction proof, or another agency process is now required.
What should be reviewed now for this failure to maintain / unsafe condition record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why is a Stop Work Order hearing serious?
DOB treats work after a Stop Work Order as a high-risk issue because the order is intended to freeze activity until the agency authorizes work to resume.
Why would someone search 111 Broadway, Brooklyn, NY 11249?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 111 Broadway, Brooklyn, NY 11249 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for 111 Broadway, Brooklyn, NY 11249?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440