Record 1: ECB Violation #39191431J — Stop Work Order / Continued Work
What the source record says
The public description for 1263 41 Street, Brooklyn, NY 11218 states: “ISSUED SUMMONS FOR DEFACING SWO, ORIGINAL PSWO WAS NOT OBSERVED AT TIME OF INSPECTION. AS PER ADMIN CODE 28-207.2.5 IT IS UNLAWFUL TO REMOVE OR DEFACE A STOP WORK ORDER FROM THE LOCATION POSTED UNTIL RESCINDED” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- permit records
- contractor logs
- proof of rescission or reinspection
- copy of the Stop Work Order
- photos by date
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 1F8 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER