Record 1: ECB Violation #35721714J — Stop Work Order / Continued Work
What the source record says
The public description for 1295 Carroll Street, Brooklyn, NY 11213 states: “TAMPERED WITH REMOVAL OF DEFECTED A WRITTEN POSTED STOP WORK ORDER. ATTIME OF INSPECTION, OBSERVED POSTED STOP. WORK ORDER #3A47769 WAS REMOVED FROM FENCE POSTED FEBRUARY 07 2026. REMEDY: COMPLY WITH CODE.” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 1F8 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER