Record 1: ECB Violation #39192659K — Stop Work Order / Continued Work
What the source record says
The public description for 144-21 75 Road, Queens, NY 11367 states: “PSWO AND ECB VIOLATION ISSUED FOR NEW ELECTRICAL WORK IN PROGRESS AT BASEMENT LEVEL. OBSERVED NEW CABLES INSTALLED IN CEILING AND WALLS FOR LIGHTS,SWITCHES AND OUTLETS. ALSO 3 NEW PANEL BOXES INSTALLED. WORK 90” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- permit records
- contractor logs
- proof of rescission or reinspection
- copy of the Stop Work Order
- photos by date
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 2C4 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT