← August 2026 NYC OATH hearings list
NYC OATH / ECB — Hearing Date Passed

197 Elm Street, Staten Island, NY 10310 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 197 Elm Street, Staten Island, NY 10310Call (866) 545-4440Email us

Property location

Property address
197 Elm Street, Staten Island, NY 10310
Borough
Staten Island
BIN
5004583
Block/Lot
5/160/101
Hearing month
August 2026
Violation records on this page
6

Hearing records

ECB violation #Hearing dateSeverityViolation categoryBalance due
39158214ZAugust 14, 2026
8:30 AM
CLASS - 1Stop work order / work continued after order$10,000
39158215KAugust 14, 2026
8:30 AM
CLASS - 1Stop work order / work continued after order$5,000
39149178XAugust 27, 2026
8:30 AM
CLASS - 1Work without permit$2,500
39149177YAugust 27, 2026
8:30 AM
CLASS - 1Work without permit$2,500
39149176MAugust 27, 2026
8:30 AM
CLASS - 1Failure to maintain building in code-compliant condition$2,500
39149179HAugust 27, 2026
8:30 AM
CLASS - 1Work without permit$1,600

Property-specific hearing analysis for 197 Elm Street, Staten Island, NY 10310

This page focuses on 197 Elm Street, Staten Island, NY 10310 and the August 2026 OATH hearing records connected to that property. The public file lists 6 hearing records, with category work involving Stop Work Order / Continued Work, Work Without Permit / Unapproved Construction, Failure to Maintain / Unsafe Condition.

The property is listed in Staten Island. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, and hearing date information of August 14, 2026, August 27, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.

Estimated listed balance across these records is $24,100. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.

For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.

Why this Staten Island hearing record matters

197 Elm Street, Staten Island, NY 10310 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.

A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.

Category-specific strategy for this property

Stop Work Order / Continued Work strategy at this property

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

Continued-work allegations can carry substantial penalties and keep a project frozen.

Work Without Permit / Unapproved Construction strategy at this property

The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.

Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.

Failure to Maintain / Unsafe Condition strategy at this property

This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.

Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.

August 2026 hearing records with record-specific analysis

Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.

Record 1: ECB Violation #39158214Z — Stop Work Order / Continued Work

Hearing dateAugust 14, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$10,000
Issue dateAugust 25, 2025
Served dateAugust 25, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “ATOI OBSERVED WORKERS ACTIVELY WORKING IN BASEMENT. AGAINST FULL STOP WORK ORDER ISSUED 5/28/25. ALSO OBSERVED WALLS FINISHED, ELECTRIC LIGHTS INSTALLED., COMPLY WITH STOP WORK ORDER” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.

What this category usually means

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

What a hearing on this record may have focused on

The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.

Documents and proof worth reviewing now

  • permit records
  • contractor logs
  • proof of rescission or reinspection
  • copy of the Stop Work Order
  • photos by date

Why this should not be ignored

Continued-work allegations can carry substantial penalties and keep a project frozen.

Cited law / infraction references
  • 112 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record 2: ECB Violation #39158215K — Stop Work Order / Continued Work

Hearing dateAugust 14, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$5,000
Issue dateAugust 25, 2025
Served dateAugust 25, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “ATOI OBSERVED PRESVIOUS POSTED STOP WORK ORDER HAS BEEN FULLY REMOVED FROM FRONT DOOR. DO NOT SEE IT POSTED ANYWHERE ELSE. SWO WAS ISSUED AND POSTED PREVIOUSLY ON 5/28/25. REPOST NOTICE, COMPLY WITH CODE” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.

What this category usually means

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

What a hearing on this record may have focused on

The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.

Documents and proof worth reviewing now

  • permit records
  • contractor logs
  • proof of rescission or reinspection
  • copy of the Stop Work Order
  • photos by date

Why this should not be ignored

Continued-work allegations can carry substantial penalties and keep a project frozen.

Cited law / infraction references
  • 1F8 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

Record 3: ECB Violation #39149178X — Work Without Permit / Unapproved Construction

Hearing dateAugust 27, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateMay 28, 2025
Served dateMay 28, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “ATOI OBSERVED A BASEMENT APT BEING BUILT. CAST IRON DRAIN AND VENTS FOR A BATH AND KITCHEN WERE BEING DONE. COPPER WATER LINES WERE IN PLACE FOR A KITCHEN AND BATH. OBSERVED TWO MEN IN THE PROCESS OF PIPING THE” Because the inspector identified a location within the premises, photos and repair proof should match that same area.

What this category usually means

The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.

What a hearing on this record may have focused on

A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.

Documents and proof worth reviewing now

  • permits
  • approved drawings
  • before-and-after photos
  • contractor records
  • legalization or restoration proof

Why this should not be ignored

Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.

Cited law / infraction references
  • 101 28-105.1 WORK WITHOUT A PERMIT

Record 4: ECB Violation #39149177Y — Work Without Permit / Unapproved Construction

Hearing dateAugust 27, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateMay 28, 2025
Served dateMay 28, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “ATOI OBSERVED A FULL APT BEING BUILT IN BASEMENT. 2BR, KIT, BATH. APPROX 45% COMPLETE. WOOD FRAMING, ELECTRIC OUELTS AND LIGHTS RUN. WATER AND SANITARY IN THE BATHROOM BEING DONE AT THE TIME OF INSPECTION, OBTA” Because the inspector identified a location within the premises, photos and repair proof should match that same area.

What this category usually means

The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.

What a hearing on this record may have focused on

A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.

Documents and proof worth reviewing now

  • permits
  • approved drawings
  • before-and-after photos
  • contractor records
  • legalization or restoration proof

Why this should not be ignored

Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.

Cited law / infraction references
  • 101 28-105.1 WORK WITHOUT A PERMIT

Record 5: ECB Violation #39149176M — Failure to Maintain / Unsafe Condition

Hearing dateAugust 27, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateMay 28, 2025
Served dateMay 28, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “IN REAR YARD EXP 3 OBSERVED EXCESSIVE PILES OF CONST DEBRIS. APPROX 30 BLACK BAGS OF TRASH, PILES OF OLD BX WIRE , OLD IRON PIPES REMOVED FROM BASEMENT,, REPAIR AND/REPLACE” Because the inspector identified a location within the premises, photos and repair proof should match that same area.

What this category usually means

This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.

What a hearing on this record may have focused on

A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.

Documents and proof worth reviewing now

  • engineer or architect report
  • permits
  • inspection reports
  • repair photos
  • contractor invoices

Why this should not be ignored

Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.

Cited law / infraction references
  • 102 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record 6: ECB Violation #39149179H — Work Without Permit / Unapproved Construction

Hearing dateAugust 27, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source-listed balance$1,600
Issue dateMay 28, 2025
Served dateMay 28, 2025

What the source record says

The public description for 197 Elm Street, Staten Island, NY 10310 states: “ATOI OBSERVED A FULL APT BEING BUILT IN BASEMENT. ROUGH WIRING WAS DONE FOR APPROX 30 OULETS, 20 RECESSED LIGHTS AND 8 WALL SWITCHES. OBSERVED MULTIPLE OPEN ELECTRIC BOXES IN THE CEILING FRAMING.POSING A POTENT” Because the inspector identified a location within the premises, photos and repair proof should match that same area.

What this category usually means

The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.

What a hearing on this record may have focused on

A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.

Documents and proof worth reviewing now

  • before-and-after photos
  • contractor records
  • legalization or restoration proof
  • permits
  • approved drawings

Why this should not be ignored

Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.

Cited law / infraction references
  • 1C9 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Questions specific to this type of OATH hearing

Why is a Stop Work Order hearing serious?

DOB treats work after a Stop Work Order as a high-risk issue because the order is intended to freeze activity until the agency authorizes work to resume.

Can this condition still be legalized or corrected after the hearing date?

Possibly. The correct path depends on the cited condition, current DOB/OATH status, zoning and code requirements, and whether restoration, legalization, professional filings, correction proof, or another agency process is now required.

What should be reviewed now for this failure to maintain / unsafe condition record?

Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.

Why would someone search 197 Elm Street, Staten Island, NY 10310?

Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 197 Elm Street, Staten Island, NY 10310 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.

Need a current record review for 197 Elm Street, Staten Island, NY 10310?

The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.

Request Current Status ReviewCall (866) 545-4440