NYC OATH / ECB — Hearing Date Passed2369 Lorillard Place, Bronx, NY 10458 — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- 2369 Lorillard Place, Bronx, NY 10458
- Borough
- Bronx
- BIN
- 2011692
- Block/Lot
- 2/3055/25
- Hearing month
- August 2026
- Violation records on this page
- 5
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39554875K | August 7, 2026 8:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $1,250 |
| 39555092Z | August 21, 2026 8:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $5,000 |
| 39555089H | August 21, 2026 8:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $2,500 |
| 39555091R | August 21, 2026 10:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $5,000 |
| 39555090P | August 21, 2026 9:30 AM | CLASS - 2 | Required inspection or equipment compliance issue | $2,500 |
Property-specific hearing analysis for 2369 Lorillard Place, Bronx, NY 10458
This page focuses on 2369 Lorillard Place, Bronx, NY 10458 and the August 2026 OATH hearing records connected to that property. The public file lists 5 hearing records, with category work involving Sign / Awning Compliance, Construction Site Safety / Public Protection, Failure to Maintain / Unsafe Condition.
The property is listed in Bronx. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 21, 2026, August 7, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $16,250. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Bronx hearing record matters
2369 Lorillard Place, Bronx, NY 10458 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Sign / Awning Compliance strategy at this property
This category generally involves signs, awnings, advertising displays, or related structures that DOB alleges were installed, maintained, or filed improperly.
Sign violations can create recurring penalties and landlord-tenant disputes.
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Failure to Maintain / Unsafe Condition strategy at this property
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39554875K — Sign / Awning Compliance
Hearing dateAugust 7, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 2, 2026
Served dateJune 2, 2026
What the source record says
The public description for 2369 Lorillard Place, Bronx, NY 10458 states: “FULL DEMOLITION OF A 2 STORY BUILDING CLOSED SITE CONSTRUCTION JOBSITE FENCE IN PLACE 8 FT IN HEIGHT PERMIT# X01385717. BUILDING PARTIALLY DEMOLISHED. OBSERVED MISSING JOBSITE INFORMATION PANEL ON FENCE AT EXP#” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category generally involves signs, awnings, advertising displays, or related structures that DOB alleges were installed, maintained, or filed improperly.
What a hearing on this record may have focused on
The hearing looks at sign dimensions, location, permit status, responsibility, and whether the sign was removed or legalized.
Documents and proof worth reviewing now
- landlord/tenant responsibility documents
- contractor invoices
- drawings
- sign permits
- photos
Why this should not be ignored
Sign violations can create recurring penalties and landlord-tenant disputes.
Cited law / infraction references- 217 BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Record 2: ECB Violation #39555092Z — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$5,000
Issue dateJune 5, 2026
Served dateJune 5, 2026
What the source record says
The public description for 2369 Lorillard Place, Bronx, NY 10458 states: “I OBSERVED WORKERS AT EXP#3 CONNER PREFORMING DEMOLITION ON EXITING WALL, WORKERS WAS USING PIPE SCAFFOLDING AND STANDING ON TOP, PIPE SCAFFOLDING NOT MAINTAIN AS PER BC 3314.1 WORKER WAS APPROX. 10 FT IN AIR W”
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references- 209 BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Record 3: ECB Violation #39555089H — Failure to Maintain / Unsafe Condition
Hearing dateAugust 21, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeSite Safety
Source-listed balance$2,500
Issue dateJune 5, 2026
Served dateJune 5, 2026
What the source record says
The public description for 2369 Lorillard Place, Bronx, NY 10458 states: “A 2-STORY BUILDING IS UNDERGOING FULL DEMOLITION WITH WORKERS ACTIVELY, UPON REQUESTING WORKERS ONSITE FOR DOCUMENT TO KEPT ONSITE PRE SHIFT MEETING, ORIENTATION, CONSTRUCTION SUPERINTENDENT LOG AND APPROVED DO”
What this category usually means
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.
Documents and proof worth reviewing now
- repair photos
- contractor invoices
- engineer or architect report
- permits
- inspection reports
Why this should not be ignored
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Cited law / infraction references- 1F2 BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Record 4: ECB Violation #39555091R — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$5,000
Issue dateJune 5, 2026
Served dateJune 5, 2026
What the source record says
The public description for 2369 Lorillard Place, Bronx, NY 10458 states: “I OBSERVED ACTIVE DEMOLITION WORK IN PROGRESS JOBSITE FAIL TO PROVIDE OVERHEAD PROTECTION FOR ADJACENT PROPERTIES EXP#1-2 CONNER, CONCRETE PAVEMENT EXP#2, EXP#2-3 CONNER, EXP#3-4 NO CAZ IN PLACE AND 4-1 CONNER” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references- 209 BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Record 5: ECB Violation #39555090P — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateJune 5, 2026
Served dateJune 5, 2026
What the source record says
The public description for 2369 Lorillard Place, Bronx, NY 10458 states: “AT THE TIME OF INSPECTION, OF A 2-STORY BUILDING FOR FULL DEMOLITION WAS ACTIVELY BEING DEMOLISHED. WINDOWS AND GLASS WERE OBSERVED REMAINING IN THE STRUCTURE WHILE DEMOLITION OPERATIONS WERE ONGOING. CONTRARY”
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Questions specific to this type of OATH hearing
What should be reviewed now for this sign / awning compliance record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this failure to maintain / unsafe condition record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search 2369 Lorillard Place, Bronx, NY 10458?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 2369 Lorillard Place, Bronx, NY 10458 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for 2369 Lorillard Place, Bronx, NY 10458?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440