Record 1: ECB Violation #39191037L — Stop Work Order / Continued Work
What the source record says
The public description for 3079 Brighton 13 Street, Brooklyn, NY 11235 states: “WORK WITHOUT PERMIT: PSWO ISSUED FOR ALL WORK DONE ON THE EXTERIOR AND INTERIOR OF THE RESIDENT : ATOI OBSERVED NEWLY INSTALLED STONE WORK ON THE FACADE AT EXPO # 1 AND METAL PANELING INSTALLED AT EXPO # 2 AND” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- permit records
- contractor logs
- proof of rescission or reinspection
- copy of the Stop Work Order
- photos by date
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 101 28-105.1 WORK WITHOUT A PERMIT