NYC OATH / ECB — Hearing Date Passed67 South 6 Street, Brooklyn, NY 11249 — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- 67 South 6 Street, Brooklyn, NY 11249
- Borough
- Brooklyn
- BIN
- 3063538
- Block/Lot
- 3/2455/27
- Hearing month
- August 2026
- Violation records on this page
- 4
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39555276N | August 19, 2026 10:30 AM | CLASS - 1 | Work without permit | $2,500 |
| 39555278R | August 19, 2026 9:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $5,000 |
| 39555277P | August 19, 2026 8:30 AM | CLASS - 1 | Construction site safety / watchperson issue | $5,000 |
| 39555275L | August 19, 2026 9:30 AM | CLASS - 1 | Work without permit | $2,500 |
Property-specific hearing analysis for 67 South 6 Street, Brooklyn, NY 11249
This page focuses on 67 South 6 Street, Brooklyn, NY 11249 and the August 2026 OATH hearing records connected to that property. The public file lists 4 hearing records, with category work involving Required Inspection / Filing Compliance, Construction Site Safety / Public Protection, Work Without Permit / Unapproved Construction.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, and hearing date information of August 19, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $15,000. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
67 South 6 Street, Brooklyn, NY 11249 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Required Inspection / Filing Compliance strategy at this property
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
Inspection and filing problems can stay open even when the physical condition is resolved.
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Work Without Permit / Unapproved Construction strategy at this property
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39555276N — Required Inspection / Filing Compliance
Hearing dateAugust 19, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 9, 2026
Served dateJune 9, 2026
What the source record says
The public description for 67 South 6 Street, Brooklyn, NY 11249 states: “AT TIME OF INSPECTION DEMOLITION WORK IN PROGRESS. I OBSERVED DEMOLITION OPERATION WERE CONTRARY TO APPROVED DEMOLITION PLANS AS JOISTS AND ROOF WERE REMOVED MORE THAN 5 FEET (APPROXIMATELY 50 FEET) AND MASONRY” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
What a hearing on this record may have focused on
The hearing should focus on whether the inspection or filing was completed, whether it was accepted, and whether records can be produced.
Documents and proof worth reviewing now
- inspection reports
- filing confirmations
- service invoices
- repair photos
- accepted correction records
Why this should not be ignored
Inspection and filing problems can stay open even when the physical condition is resolved.
Cited law / infraction references- 182 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Record 2: ECB Violation #39555278R — Required Inspection / Filing Compliance
Hearing dateAugust 19, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source-listed balance$5,000
Issue dateJune 9, 2026
Served dateJune 9, 2026
What the source record says
The public description for 67 South 6 Street, Brooklyn, NY 11249 states: “RESPONDING TO A COMPLAINT INSPECTION REVEALED: CONTRACTOR FAILURE TO INSTITUTE SAFETY MEASURES INADEQUATE/MISSING CONTENT ON PRE-SHIFT SAFETY MEETING, NO MENTION ABOUT SPECIFIC/ GENERAL WORK TASK HAZARDOUS AND”
What this category usually means
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
What a hearing on this record may have focused on
The hearing should focus on whether the inspection or filing was completed, whether it was accepted, and whether records can be produced.
Documents and proof worth reviewing now
- inspection reports
- filing confirmations
- service invoices
- repair photos
- accepted correction records
Why this should not be ignored
Inspection and filing problems can stay open even when the physical condition is resolved.
Cited law / infraction references- 1K1 BC 3301.12.2 FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRE-SHIF
Record 3: ECB Violation #39555277P — Construction Site Safety / Public Protection
Hearing dateAugust 19, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source-listed balance$5,000
Issue dateJune 9, 2026
Served dateJune 9, 2026
What the source record says
The public description for 67 South 6 Street, Brooklyn, NY 11249 states: “BC 3309.1 AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE, DEMOLITION AT ROOF LEVEL 20' HEIGHT APPROX. NO OVERHEAD PROTECTION FOR ADJOINING PROPERTIES AT EXPOSURE# 2/3/4 AT REAR CREATING POTENTIAL SAFETY HAZAR” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 4: ECB Violation #39555275L — Work Without Permit / Unapproved Construction
Hearing dateAugust 19, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 9, 2026
Served dateJune 9, 2026
What the source record says
The public description for 67 South 6 Street, Brooklyn, NY 11249 states: “AT TIME OF INSPECTION OBSERVED ACTIVE JOB SITE: 5 WORKERS ON SITE PERFORMING DEMOLITION OF ROOF AS A PART OF STRUCTURAL WORK UNDER PERMIT # B01316543-S7-ST IN CONJUNTION TO THE ALT-CO APLICATION# B01316543-I1 U” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
The record appears to involve work DOB alleges was performed without required approval, permit issuance, or approved documents.
What a hearing on this record may have focused on
A hearing on this type of record may have asked whether the observed work existed, whether a permit covered it, whether the respondent was legally responsible, and whether the work was restored or legalized.
Documents and proof worth reviewing now
- before-and-after photos
- contractor records
- legalization or restoration proof
- permits
- approved drawings
Why this should not be ignored
Unpermitted work can block approvals, complicate closing or refinancing, and trigger repeat penalties.
Cited law / infraction references- 101 28-105.1 WORK WITHOUT A PERMIT
Questions specific to this type of OATH hearing
What should be reviewed now for this required inspection / filing compliance record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Can this condition still be legalized or corrected after the hearing date?
Possibly. The correct path depends on the cited condition, current DOB/OATH status, zoning and code requirements, and whether restoration, legalization, professional filings, correction proof, or another agency process is now required.
Why would someone search 67 South 6 Street, Brooklyn, NY 11249?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 67 South 6 Street, Brooklyn, NY 11249 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for 67 South 6 Street, Brooklyn, NY 11249?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440