Record 1: ECB Violation #39192279Z — Stop Work Order / Continued Work
What the source record says
The public description for 69-18 181 Street, Queens, NY 11365 states: “PSWO AND ECB VIOLATION ISSUED FOR WORK WITHOUT PERMIT. ATOI, OBSERVED ACTIVE CONSTRUCTION WORK IN PROGRESS. A FRONT PORCH AT EXPO.#1, MEASURING APPROX. 30FT X 8FT WIDE X 4FT HIGH AND A WOODEN DECK AT THE BACKYA” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 201 28-105.1 WORK WITHOUT A PERMIT