Record 1: ECB Violation #39167474J — Stop Work Order / Continued Work
What the source record says
The public description for 71 Maple Street, Brooklyn, NY 11225 states: “ATOI OBSERVED WINDOW AND SIDE DOOR HAVE BEEN INSTALLED AT EXPOSURE 4 EXTENSION OF PROPERTY WHILE ON STOP WORK ORDER ISSUED 08/20/2025 VIOLATIONS 39157790M 39157791Y, COMPLY WITH STOP WORK ORDER” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- permit records
- contractor logs
- proof of rescission or reinspection
- copy of the Stop Work Order
- photos by date
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 112 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER