NYC OATH / ECB — Hearing Date Passed75-27 188 Street, Queens, NY 11366 — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- 75-27 188 Street, Queens, NY 11366
- Borough
- Queens
- BIN
- 4155072
- Block/Lot
- 4/7205/60
- Hearing month
- August 2026
- Violation records on this page
- 3
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39192907K | August 25, 2026 8:30 AM | CLASS - 2 | Work without permit | $1,250 |
| 39192906Z | August 25, 2026 10:30 AM | CLASS - 2 | Exterior property or public-safety condition | $2,500 |
| 39192905R | August 25, 2026 9:30 AM | CLASS - 1 | Exterior property or public-safety condition | $10,000 |
Property-specific hearing analysis for 75-27 188 Street, Queens, NY 11366
This page focuses on 75-27 188 Street, Queens, NY 11366 and the August 2026 OATH hearing records connected to that property. The public file lists 3 hearing records, with category work involving Facade / Exterior Wall Compliance, Construction Site Safety / Public Protection, Construction.
The property is listed in Queens. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 25, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $13,750. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Queens hearing record matters
75-27 188 Street, Queens, NY 11366 should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Facade / Exterior Wall Compliance strategy at this property
This category usually involves exterior wall, facade, FISP/Local Law 11, unsafe facade condition, or exterior reporting issues.
Facade matters can become expensive quickly because they may require professional reports, sheds, and DOB oversight.
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Construction strategy at this property
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39192907K — Facade / Exterior Wall Compliance
Hearing dateAugust 25, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 17, 2026
Served dateJune 17, 2026
What the source record says
The public description for 75-27 188 Street, Queens, NY 11366 states: “OBSERVED NEW EXCAVATION WITH FOUNDATION WALL WAS DONE AT FRONT EXTERIOR OF SITE, FOAM WITH STUCCO APPROX. 3INCH THICKNESS BEING DONE AROUND THE ENTIRE BUILDING EXTERIOR WALL & MECHANICAL UNITS WITH DUCT WORK IN” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
This category usually involves exterior wall, facade, FISP/Local Law 11, unsafe facade condition, or exterior reporting issues.
What a hearing on this record may have focused on
The hearing often turns on whether the facade condition existed, whether reports were filed, whether public protection was installed, and whether repairs were documented.
Documents and proof worth reviewing now
- sidewalk shed documents
- repair contracts
- photos
- architect or engineer report
- FISP records
Why this should not be ignored
Facade matters can become expensive quickly because they may require professional reports, sheds, and DOB oversight.
Cited law / infraction references- 282 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Record 2: ECB Violation #39192906Z — Construction Site Safety / Public Protection
Hearing dateAugust 25, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateJune 17, 2026
Served dateJune 17, 2026
What the source record says
The public description for 75-27 188 Street, Queens, NY 11366 states: “OBSERVED MISSING GUARDRAILS, LOOSE & HANGING DEBRIS NETTING & WORKING DECK PLATFORM IS NOT FULLY PLANKED AT ERECTED TEMP. SCAFFOLDING AT EXTERIOR OF SITE & WORKERS ON SCAFFOLDING DOING STUCCO WORK. 3314.5; 3314” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 3: ECB Violation #39192905R — Construction
Hearing dateAugust 25, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$10,000
Issue dateJune 17, 2026
Served dateJune 17, 2026
What the source record says
The public description for 75-27 188 Street, Queens, NY 11366 states: “OBSERVED NO TEMPORARY CONSTRUCTION FENCE WAS ERECTED AROUND EXTERIOR OF SITE WHERE NEW EXCAVATION & FOUNDATION WORK IS BEING DONE PLUS HOLE OPENING WITH TRIP & FALL HAZARD EXIST, SITE IS OPEN & EXPOSED TO THE P” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the inspector’s observation, legal responsibility, whether the condition existed, and whether proof was submitted properly.
Documents and proof worth reviewing now
- violation notice
- current photos
- permits
- contractor/professional documents
- proof of correction
Why this should not be ignored
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
Cited law / infraction references- 109 BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Questions specific to this type of OATH hearing
What should be reviewed now for this facade / exterior wall compliance record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this construction record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search 75-27 188 Street, Queens, NY 11366?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search 75-27 188 Street, Queens, NY 11366 when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for 75-27 188 Street, Queens, NY 11366?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440