Record 1: ECB Violation #39189655X — Stop Work Order / Continued Work
What the source record says
The public description for 975 Lincoln Place, Brooklyn, NY 11213 states: “ATOI OBSERVED WRITTEN FULL STOP WORK ORDER POSTED IN THE PROPERTY DATED 5/7/2026 UNDER ECB VIOLATION 39187726P. WAS REMOVED, DEFACED, AND TAMPERED WITH. ECB VIOLATION ISSUED., COMPLY WITH CODE” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 1F8 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER