Record 1: ECB Violation #39555644H — Sidewalk / Curb / Public Way Condition
What the source record says
The public description for BIN 1035721, Manhattan, NY states: “BC 3307.6.4.9 AT TIME OF INSPECTION OF A 28 STORIES NEW BUILDING I OBSERVED SIDEWALK SHED AND CONSTRUCTION FENCE INSTALLED BETWEEN EXPOSURE # 1 AND 4, BLOCKING PEDESTRIAN VISIBILITY AND OBSTRUCTING PEDESTRIAN C” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time. Curb or sidewalk issues may require DOT/DOB records and proof of restoration to legal condition.
What this category usually means
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
What a hearing on this record may have focused on
The hearing may examine the exact location, who performed the work, whether DOT/DOB permits existed, and whether restoration occurred.
Documents and proof worth reviewing now
- contractor invoices
- survey or sketch
- restoration proof
- DOT/DOB permits
- before-and-after photos
Why this should not be ignored
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
- 1P7