NYC OATH / ECB — Hearing Date PassedBIN 2011867, Bronx, NY — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- BIN 2011867, Bronx, NY
- Borough
- Bronx
- BIN
- 2011867
- Block/Lot
- 2/3063/146
- Hearing month
- August 2026
- Violation records on this page
- 6
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39555634Y | August 21, 2026 10:30 AM | CLASS - 1 | Work without permit | $2,500 |
| 39555632K | August 21, 2026 9:30 AM | CLASS - 1 | Construction site safety / watchperson issue | $5,000 |
| 39555633M | August 21, 2026 8:30 AM | CLASS - 2 | Exterior property or public-safety condition | $2,500 |
| 39555629J | August 21, 2026 9:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $2,500 |
| 39555631Z | August 21, 2026 10:30 AM | CLASS - 2 | Work without permit | $1,250 |
| 39555630R | August 21, 2026 8:30 AM | CLASS - 2 | Work without permit | $1,250 |
Property-specific hearing analysis for BIN 2011867, Bronx, NY
This page focuses on BIN 2011867, Bronx, NY and the August 2026 OATH hearing records connected to that property. The public file lists 6 hearing records, with category work involving Construction, Construction Site Safety / Public Protection, Unknown, Sidewalk / Curb / Public Way Condition.
The property is listed in Bronx. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 21, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $15,000. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Bronx hearing record matters
BIN 2011867, Bronx, NY should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Construction strategy at this property
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Unknown strategy at this property
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
Sidewalk / Curb / Public Way Condition strategy at this property
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39555634Y — Construction
Hearing dateAugust 21, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “7 STORY NB ACTIVE SITE.STRUCTURAL FORMWORK 4 FL WORKING DECK.CONTRARY TO PLANS ONSITE, INSIDE STAIRWELL 14 'OPENINGS 1,2,3 FLS, DETAILS SHOW 16'-6" DBL BOX STRINGER SILLS, SECURE TO SLAB TO PREVENT MOVEMENT.MIS” Because the inspector identified a location within the premises, photos and repair proof should match that same area.
What this category usually means
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the inspector’s observation, legal responsibility, whether the condition existed, and whether proof was submitted properly.
Documents and proof worth reviewing now
- permits
- contractor/professional documents
- proof of correction
- violation notice
- current photos
Why this should not be ignored
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
Cited law / infraction references- 182 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Record 2: ECB Violation #39555632K — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$5,000
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “PROPOSED 7 STORY AT 4 FLOOR WORKING DECK ACTIVE SITE. OBSERVED INADEQUATE GUARDRAIL SYSTEMS AT MULTIPLE FLOORS/LOCATIONS. MISSING SAFETY NETTING, OPEN SECTIONS, SOME AREA'S NO GUARDRAILS, INADEQUATE MID RAILS/B” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references- 115 BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Record 3: ECB Violation #39555633M — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “7 STORY NB ACTIVE SITE.OBSERVED UNFINISHED EXTERIOR WORK WITHIN 5 FT OF ADJOINING PROPERTY WINDOWS AT EXP#2.2 STORY OCCUPIED BUILDING ALSO OBSERVED MATERIALS/DEBRIS ON OVERHEAD PROTECTION IN FRONT OF WINDOWS NO” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 4: ECB Violation #39555629J — Unknown
Hearing dateAugust 21, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “7 STORY NEW BUILDING ACTIVE SITE. OBSERVED LARGE PILES OF COMBUSTIBLE CONSTRUCTION MATERIALS/DEBRIS WOOD, PLASTIC, FOAM ETC AT EXP#2 1 ST FL & MULTIPLE LOCATIONS APPROX. 10 FTS 12 FT WIDE, AT EXP#3 LARGE PILES”
What this category usually means
The public record identifies a DOB/ECB compliance issue requiring review of the cited description, law section, agency history, and correction status.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the inspector’s observation, legal responsibility, whether the condition existed, and whether proof was submitted properly.
Documents and proof worth reviewing now
- violation notice
- current photos
- permits
- contractor/professional documents
- proof of correction
Why this should not be ignored
Even technical DOB/ECB matters can create penalties, open records, and delays when selling, refinancing, permitting, or managing property.
Cited law / infraction references Record 5: ECB Violation #39555631Z — Construction Site Safety / Public Protection
Hearing dateAugust 21, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “7 STORY NB ACTIVE SITE.WORK CONTRARY TO APPROVED SITE SAFETY PLANS (SSP).OBSERVED FORMWORK AT EXP#1 ACTIVE ABOVE WORKERS ON 1ST FL/NO OVERHEAD PROTECTION AS PER PLANS.OBSERVED WORKER SHANTY AT EXP#3 AT 2167 AUT” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references- 282 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Record 6: ECB Violation #39555630R — Sidewalk / Curb / Public Way Condition
Hearing dateAugust 21, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 15, 2026
Served dateJune 16, 2026
What the source record says
The public description for BIN 2011867, Bronx, NY states: “7 STORY NB ACTIVE SITE.OBSERVED SIDEWALK SHED/OVERHEAD PROTECTION(OHP) IN PLACE AT EXP#1,2 PERMIT#X01181228. UPON REVIEW CAR PARKED NEXT TO OHP ON ADJOINING PROPERTY AT EXP#2. MISSING HIGH VISIBILITY MARKINGS/N” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time. Curb or sidewalk issues may require DOT/DOB records and proof of restoration to legal condition.
What this category usually means
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
What a hearing on this record may have focused on
The hearing may examine the exact location, who performed the work, whether DOT/DOB permits existed, and whether restoration occurred.
Documents and proof worth reviewing now
- DOT/DOB permits
- before-and-after photos
- contractor invoices
- survey or sketch
- restoration proof
Why this should not be ignored
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
Cited law / infraction references- 282 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Questions specific to this type of OATH hearing
What should be reviewed now for this construction record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this unknown record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this sidewalk / curb / public way condition record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search BIN 2011867, Bronx, NY?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search BIN 2011867, Bronx, NY when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for BIN 2011867, Bronx, NY?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440