← August 2026 NYC OATH hearings list
NYC OATH / ECB — Hearing Date Passed

BIN 2816743, Bronx, NY — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for BIN 2816743, Bronx, NYCall (866) 545-4440Email us

Property location

Property address
BIN 2816743, Bronx, NY
Borough
Bronx
BIN
2816743
Block/Lot
2/2987/52
Hearing month
August 2026
Violation records on this page
3

Hearing records

ECB violation #Hearing dateSeverityViolation categoryBalance due
39555244ZAugust 21, 2026
10:30 AM
CLASS - 1Exterior property or public-safety condition$4,800
39555604NAugust 21, 2026
8:30 AM
CLASS - 1Stop work order / work continued after order$2,500
39555603LAugust 21, 2026
9:30 AM
CLASS - 1Stop work order / work continued after order$2,500

Property-specific hearing analysis for BIN 2816743, Bronx, NY

This page focuses on BIN 2816743, Bronx, NY and the August 2026 OATH hearing records connected to that property. The public file lists 3 hearing records, with category work involving Elevator / Conveyance Equipment, Stop Work Order / Continued Work.

The property is listed in Bronx. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, and hearing date information of August 21, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.

Estimated listed balance across these records is $9,800. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.

For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.

Why this Bronx hearing record matters

BIN 2816743, Bronx, NY should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.

A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.

Category-specific strategy for this property

Elevator / Conveyance Equipment strategy at this property

This category concerns elevator or conveyance compliance, inspection, maintenance, testing, or required filing obligations.

Elevator violations can affect tenant safety, insurance, and building operations.

Stop Work Order / Continued Work strategy at this property

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

Continued-work allegations can carry substantial penalties and keep a project frozen.

August 2026 hearing records with record-specific analysis

Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.

Record 1: ECB Violation #39555244Z — Elevator / Conveyance Equipment

Hearing dateAugust 21, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$4,800
Issue dateJune 8, 2026
Served dateJune 9, 2026

What the source record says

The public description for BIN 2816743, Bronx, NY states: “ACTIVE SITE OBSERVED WITH ARTICULATING BOOM LIFT AT EXP 1&4 PERFORMING FACADE WORK ABOVE 2ND FLOOR WITHOUT REQUIRED FLAGGER, PEDESTRIAN PROTECTION. PROPERTY OWNER, PEDESTRIANS WAS EXPOSED TO OVERHEAD AND SITE R” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.

What this category usually means

This category concerns elevator or conveyance compliance, inspection, maintenance, testing, or required filing obligations.

What a hearing on this record may have focused on

The hearing may look at required inspections, tests, reports, unsafe equipment, and contractor records.

Documents and proof worth reviewing now

  • DOB filing confirmations
  • repair documentation
  • inspection reports
  • elevator company invoices

Why this should not be ignored

Elevator violations can affect tenant safety, insurance, and building operations.

Cited law / infraction references
  • 1E7 BC3307.3 FAILURE TO PROVIDE PEDESTRAIN PROTECTION FOR SIDEWALKS AND WALKWAYS

Record 2: ECB Violation #39555604N — Stop Work Order / Continued Work

Hearing dateAugust 21, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 16, 2026
Served dateJune 16, 2026

What the source record says

The public description for BIN 2816743, Bronx, NY states: “13 STORY NB ACTIVE SITE.OBSERVED EXTERIOR WORK FINISHED AT EXP#4.RESEARCH ON INSPECTION PLUS DOB NOW/BIS DOB RECORDS.PARTIAL STOP WORK ORDER ISSUED/POSTED/SERVED ON 6/8/2026.ECB#39555603L SSC ALLOWED WORK AGAIN” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.

What this category usually means

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

What a hearing on this record may have focused on

The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.

Documents and proof worth reviewing now

  • permit records
  • contractor logs
  • proof of rescission or reinspection
  • copy of the Stop Work Order
  • photos by date

Why this should not be ignored

Continued-work allegations can carry substantial penalties and keep a project frozen.

Cited law / infraction references
  • 193 BC 3310.8.2 SITE SAFETY MANAGER/COORDINATOR FAILED TO IMMEDIATELY NOTIFY THE DEPAR

Record 3: ECB Violation #39555603L — Stop Work Order / Continued Work

Hearing dateAugust 21, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 16, 2026
Served dateJune 16, 2026

What the source record says

The public description for BIN 2816743, Bronx, NY states: “13 STORY NB ACTIVE SITE.OBSERVED EXTERIOR WORK FINISHED AT EXP#4.RESEARCH ON INSPECTION PLUS DOB NOW/BIS DEPARTMENT RECORDS.PARTIAL STOP WORK ORDER ISSUED/POSTED/SERVED ON 6/8/2026,FAILURE TO PROVIDE PEDESTRIAN” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.

What this category usually means

The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.

What a hearing on this record may have focused on

The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.

Documents and proof worth reviewing now

  • copy of the Stop Work Order
  • photos by date
  • permit records
  • contractor logs
  • proof of rescission or reinspection

Why this should not be ignored

Continued-work allegations can carry substantial penalties and keep a project frozen.

Cited law / infraction references
  • 187 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Questions specific to this type of OATH hearing

What should be reviewed now for this elevator / conveyance equipment record?

Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.

Why is a Stop Work Order hearing serious?

DOB treats work after a Stop Work Order as a high-risk issue because the order is intended to freeze activity until the agency authorizes work to resume.

Why would someone search BIN 2816743, Bronx, NY?

Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search BIN 2816743, Bronx, NY when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.

Need a current record review for BIN 2816743, Bronx, NY?

The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.

Request Current Status ReviewCall (866) 545-4440