NYC OATH / ECB — Hearing Date PassedBIN 3429897, Brooklyn, NY — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- BIN 3429897, Brooklyn, NY
- Borough
- Brooklyn
- BIN
- 3429897
- Block/Lot
- 3/1615/82
- Hearing month
- August 2026
- Violation records on this page
- 2
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39551383K | August 7, 2026 8:30 AM | CLASS - 2 | DOB/OATH code compliance violation | $2,500 |
| 39551382Z | August 7, 2026 8:30 AM | CLASS - 1 | Stop work order / work continued after order | $10,000 |
Property-specific hearing analysis for BIN 3429897, Brooklyn, NY
This page focuses on BIN 3429897, Brooklyn, NY and the August 2026 OATH hearing records connected to that property. The public file lists 2 hearing records, with category work involving Construction Site Safety / Public Protection, Stop Work Order / Continued Work.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 7, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $12,500. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
BIN 3429897, Brooklyn, NY should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Stop Work Order / Continued Work strategy at this property
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
Continued-work allegations can carry substantial penalties and keep a project frozen.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39551383K — Construction Site Safety / Public Protection
Hearing dateAugust 7, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateMarch 9, 2026
Served dateMarch 9, 2026
What the source record says
The public description for BIN 3429897, Brooklyn, NY states: “OBSERVED AT THE REAR OF THE BUILDING EXPO#2. MISSING OVERHEAD PROTECTION FOR THE ADJOINING BUILDINGS PROPERTY. SITE IS CURRENTLY UP TO THE SECOND FLOOR WITH STEAL AND CMU WORK INSTALLED PAST THE HEIGHT THAT WOU” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 2: ECB Violation #39551382Z — Stop Work Order / Continued Work
Hearing dateAugust 7, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$10,000
Issue dateMarch 9, 2026
Served dateMarch 9, 2026
What the source record says
The public description for BIN 3429897, Brooklyn, NY states: “DURING RE-INSPECTION. OBSERVED THE SITE CONTINUE DOING WORK WHILE ON NOTICE OF SWO ISSUED ON 2/22/26 FOR NO STRUCTURAL WORK ALLOWED ENTIRE SITE WHILE SITE WAS AT THE 1ST FL. ADDITIONAL STRUCTURAL STEAL AND CMU” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
Cited law / infraction references- 112 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Questions specific to this type of OATH hearing
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why is a Stop Work Order hearing serious?
DOB treats work after a Stop Work Order as a high-risk issue because the order is intended to freeze activity until the agency authorizes work to resume.
Why would someone search BIN 3429897, Brooklyn, NY?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search BIN 3429897, Brooklyn, NY when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for BIN 3429897, Brooklyn, NY?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440