NYC OATH / ECB — Hearing Date PassedBIN 3808389, Brooklyn, NY — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- BIN 3808389, Brooklyn, NY
- Borough
- Brooklyn
- BIN
- 3808389
- Block/Lot
- 3/3383/1
- Hearing month
- August 2026
- Violation records on this page
- 4
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39554596H | August 5, 2026 10:30 AM | CLASS - 1 | Required inspection or equipment compliance issue | $10,000 |
| 39554595X | August 5, 2026 9:30 AM | CLASS - 1 | Construction site safety / watchperson issue | $5,000 |
| 39554597J | August 5, 2026 8:30 AM | CLASS - 2 | Required inspection or equipment compliance issue | $2,500 |
| 39554594Y | August 5, 2026 8:30 AM | CLASS - 2 | Work without permit | $1,250 |
Property-specific hearing analysis for BIN 3808389, Brooklyn, NY
This page focuses on BIN 3808389, Brooklyn, NY and the August 2026 OATH hearing records connected to that property. The public file lists 4 hearing records, with category work involving Construction Site Safety / Public Protection, Sidewalk / Curb / Public Way Condition.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 5, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $18,750. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
BIN 3808389, Brooklyn, NY should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Sidewalk / Curb / Public Way Condition strategy at this property
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39554596H — Construction Site Safety / Public Protection
Hearing dateAugust 5, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source-listed balance$10,000
Issue dateMay 25, 2026
Served dateMay 25, 2026
What the source record says
The public description for BIN 3808389, Brooklyn, NY states: “AT TIME OF INSPECTION OF A 4-STORY NEW BUILDING ACTIVE JOB SITE, WORKERS WERE OBSERVED PERFORMING FRAMING THE 2ND FLOOR AT EXP. 4 WITHOUT REQUIRED OVERHEAD PROTECTION AT ADJACENT PROPERTY. CONDITION CREATES A H” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 2: ECB Violation #39554595X — Construction Site Safety / Public Protection
Hearing dateAugust 5, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$5,000
Issue dateMay 25, 2026
Served dateMay 25, 2026
What the source record says
The public description for BIN 3808389, Brooklyn, NY states: “AT TIME OF INSPECTION OF A 4-STORY ACTIVE JOB SITE, WORKERS WERE OBSERVED PERFORMING FRAMING THE 2ND FLOOR WITHOUT A REQUIRED GUARDRAIL SYSTEM, CREATING A HAZARDOUS CONDITION TO WORKERS AND PERSONS ENTERING THE” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references- 115 BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Record 3: ECB Violation #39554597J — Construction Site Safety / Public Protection
Hearing dateAugust 5, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateMay 25, 2026
Served dateMay 25, 2026
What the source record says
The public description for BIN 3808389, Brooklyn, NY states: “AT TIME OF INSPECTION OF A 4-STORY ACTIVE JOB SITE, WORKERS WERE OBSERVED PERFORMING FRAMING THE 2ND FLOOR WITHOUT REQUIRED WINDOW PROTECTION AT ADJACENT PROPERTY AT EXP. 2,&4 CREATING A HAZARDOUS CONDITION TO” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- contractor daily reports
- permits
- watchperson records
- site safety logs
- protection photos
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 4: ECB Violation #39554594Y — Sidewalk / Curb / Public Way Condition
Hearing dateAugust 5, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateMay 25, 2026
Served dateMay 25, 2026
What the source record says
The public description for BIN 3808389, Brooklyn, NY states: “AT TIME OF INSPECTION OF A 4-STORY ACTIVE JOB SITE, SIDEWALK SHED AT EXP. 1 AND 4 DID NOT CONFORM TO APPROVED PLANS. MISSING CROSS BRACE AT EXP. 1 AND MISSING REQUIRED 5-FT EXTENSION AT EXP. 4 OBSERVED. STOP AL” Because the inspector identified a location within the premises, photos and repair proof should match that same area. Curb or sidewalk issues may require DOT/DOB records and proof of restoration to legal condition.
What this category usually means
This category concerns sidewalk, curb, curb cut, public-way obstruction, or work affecting an area that may require permits or restoration.
What a hearing on this record may have focused on
The hearing may examine the exact location, who performed the work, whether DOT/DOB permits existed, and whether restoration occurred.
Documents and proof worth reviewing now
- contractor invoices
- survey or sketch
- restoration proof
- DOT/DOB permits
- before-and-after photos
Why this should not be ignored
Public-way issues can attract repeat enforcement and interfere with sales, access, or future approvals.
Cited law / infraction references- 282 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Questions specific to this type of OATH hearing
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this sidewalk / curb / public way condition record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search BIN 3808389, Brooklyn, NY?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search BIN 3808389, Brooklyn, NY when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for BIN 3808389, Brooklyn, NY?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440