NYC OATH / ECB — Hearing Date PassedBIN 3829447, Brooklyn, NY — NYC OATH Hearing & Violation Status Review
The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.
Property location
- Property address
- BIN 3829447, Brooklyn, NY
- Borough
- Brooklyn
- BIN
- 3829447
- Block/Lot
- 3
- Hearing month
- August 2026
- Violation records on this page
- 5
Hearing records
| ECB violation # | Hearing date | Severity | Violation category | Balance due |
|---|
| 39555168X | August 12, 2026 9:30 AM | CLASS - 2 | Construction site safety / watchperson issue | $2,500 |
| 39555308Z | August 19, 2026 10:30 AM | CLASS - 1 | Stop work order / work continued after order | $10,000 |
| 39555220Y | August 12, 2026 8:30 AM | CLASS - 2 | Work without permit | $1,250 |
| 39555074P | August 12, 2026 10:30 AM | CLASS - 2 | Required inspection or equipment compliance issue | $5,000 |
| 39555073N | August 12, 2026 9:30 AM | CLASS - 1 | Failure to maintain building in code-compliant condition | $2,500 |
Property-specific hearing analysis for BIN 3829447, Brooklyn, NY
This page focuses on BIN 3829447, Brooklyn, NY and the August 2026 OATH hearing records connected to that property. The public file lists 5 hearing records, with category work involving Construction Site Safety / Public Protection, Stop Work Order / Continued Work, Elevator / Conveyance Equipment, Required Inspection / Filing Compliance, Failure to Maintain / Unsafe Condition.
The property is listed in Brooklyn. The source extract used to build this page showed hearing status values of PENDING, severity values of CLASS - 1, CLASS - 2, and hearing date information of August 12, 2026, August 19, 2026. Those source values are historical and should not be treated as the current OATH or DOB disposition after the hearing date.
Estimated listed balance across these records is $21,250. Always verify the current balance and status with NYC OATH/DOB because defaults, payments, settlements, and certifications can change after export.
For owners, brokers, buyers, attorneys, contractors, and managers connected to this property, the practical question is whether there is enough proof, permit history, correction documentation, or professional support to reduce risk and close the matter properly.
Why this Brooklyn hearing record matters
BIN 3829447, Brooklyn, NY should be reviewed as a specific property file, not as a generic DOB matter. The borough, BIN, block/lot, public description, and hearing status all affect the correction path and the documents that should be gathered.
A useful review compares the OATH record against DOB BIS, permit history, complaint history, open job filings, and any physical correction already performed at the premises.
Category-specific strategy for this property
Construction Site Safety / Public Protection strategy at this property
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Stop Work Order / Continued Work strategy at this property
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
Continued-work allegations can carry substantial penalties and keep a project frozen.
Elevator / Conveyance Equipment strategy at this property
This category concerns elevator or conveyance compliance, inspection, maintenance, testing, or required filing obligations.
Elevator violations can affect tenant safety, insurance, and building operations.
Required Inspection / Filing Compliance strategy at this property
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
Inspection and filing problems can stay open even when the physical condition is resolved.
Failure to Maintain / Unsafe Condition strategy at this property
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
August 2026 hearing records with record-specific analysis
Each record below uses the public violation description, cited law references, status, severity, and listed balance to create a more specific post-hearing review summary.
Record 1: ECB Violation #39555168X — Construction Site Safety / Public Protection
Hearing dateAugust 12, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$2,500
Issue dateJune 7, 2026
Served dateJune 7, 2026
What the source record says
The public description for BIN 3829447, Brooklyn, NY states: “BC3303.3 WATCHPERSON 11 STORY NEW BUILDING, BUILDING APPROXIMATELY 8788 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHP” Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
This category concerns construction-site safety, public protection, watchperson requirements, guardrails, fences, sheds, sidewalk protection, or access controls.
What a hearing on this record may have focused on
The hearing may examine whether required protection was in place at the inspection time and whether the cited party controlled the work.
Documents and proof worth reviewing now
- site safety logs
- protection photos
- contractor daily reports
- permits
- watchperson records
Why this should not be ignored
Site-safety hearings can involve large penalties because DOB treats public and worker protection as urgent.
Cited law / infraction references Record 2: ECB Violation #39555308Z — Stop Work Order / Continued Work
Hearing dateAugust 19, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$10,000
Issue dateJune 11, 2026
Served dateJune 11, 2026
What the source record says
The public description for BIN 3829447, Brooklyn, NY states: “AT TIME OF INSPECTION UPON REVIEWING PREVIOUS PICS, GC FAIL TO COMPLY WITH THE COMMISSIONER'S ORDER WORK AGAINST STOP WORK ORDER ISSUED UNDER REFERENCE COMPLAINT# 3A65687.. I OBSERVED THE COPING CAPS WERE COMPL” The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
Cited law / infraction references- 112 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Record 3: ECB Violation #39555220Y — Elevator / Conveyance Equipment
Hearing dateAugust 12, 2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source-listed balance$1,250
Issue dateJune 7, 2026
Served dateJune 8, 2026
What the source record says
The public description for BIN 3829447, Brooklyn, NY states: “AT TIME OF INSPECTION OBSERVED DIFFERENT TRADE IN PROCESS OF WORK PAINTERS, PLUMBING, ELEVATOR CREW WORK PERFORMING EXCEPT CLEANING OPERATION NOT IN COMPLIANCE TO AHV. STOP ALL WORK CONTRARY TO AFTER HOUR VA”
What this category usually means
This category concerns elevator or conveyance compliance, inspection, maintenance, testing, or required filing obligations.
What a hearing on this record may have focused on
The hearing may look at required inspections, tests, reports, unsafe equipment, and contractor records.
Documents and proof worth reviewing now
- inspection reports
- elevator company invoices
- DOB filing confirmations
- repair documentation
Why this should not be ignored
Elevator violations can affect tenant safety, insurance, and building operations.
Cited law / infraction references- 2C2 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
Record 4: ECB Violation #39555074P — Required Inspection / Filing Compliance
Hearing dateAugust 12, 2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source-listed balance$5,000
Issue dateJune 4, 2026
Served dateJune 4, 2026
What the source record says
The public description for BIN 3829447, Brooklyn, NY states: “RESPONDING TO AN INCIDENT, PAINTER KATHERINE MORETA INJURED HER LEFT TOE ON 06/04/2026 12:25 PM INSPECTION REVEALED: CONTRACTOR FAILURE TO NOTIFY DEPARTMENT ABOUT INCIDENT IMMEDIATELY, NOTIFICATION DONE MORE TH”
What this category usually means
This category concerns a required inspection, filing, report, registration, or certification obligation connected to building systems or site conditions.
What a hearing on this record may have focused on
The hearing should focus on whether the inspection or filing was completed, whether it was accepted, and whether records can be produced.
Documents and proof worth reviewing now
- inspection reports
- filing confirmations
- service invoices
- repair photos
- accepted correction records
Why this should not be ignored
Inspection and filing problems can stay open even when the physical condition is resolved.
Cited law / infraction references- 2K4 28-103.21.1 FAILURE TO NOTIFY THE DEPARTMENT OF AN INCIDENT THAT RESULTED IN A FAT
Record 5: ECB Violation #39555073N — Failure to Maintain / Unsafe Condition
Hearing dateAugust 12, 2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source-listed balance$2,500
Issue dateJune 4, 2026
Served dateJune 4, 2026
What the source record says
The public description for BIN 3829447, Brooklyn, NY states: “RESPONDING TO AN INCIDENT, PAINTER KATHERINE MORETA INJURED HIS LEFT TOE. GC FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES. INADEQUATE HOUSEKEEPING/INADEQUATE STORAGE MATERIAL ELEVATOR COVER IN THE MIDDLE O”
What this category usually means
This category usually concerns a building, structure, lot, wall, roof, opening, or component allegedly not maintained in safe code-compliant condition.
What a hearing on this record may have focused on
A hearing on this type of record may have focused on the condition observed by the inspector, responsibility, timing, repairs, and whether professional proof is required.
Documents and proof worth reviewing now
- engineer or architect report
- permits
- inspection reports
- repair photos
- contractor invoices
Why this should not be ignored
Unsafe-condition records can trigger emergency repairs, reinspections, civil penalties, and transaction delays.
Cited law / infraction references- 181 BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Questions specific to this type of OATH hearing
What should be reviewed now for this construction site safety / public protection record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why is a Stop Work Order hearing serious?
DOB treats work after a Stop Work Order as a high-risk issue because the order is intended to freeze activity until the agency authorizes work to resume.
What should be reviewed now for this elevator / conveyance equipment record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
What should be reviewed now for this required inspection / filing compliance record?
Start by confirming the current OATH/DOB status, the exact public description, law section, responsible party, correction evidence, later hearing activity, payments or judgments, and any filing or certification activity that occurred after the original source extract.
Why would someone search BIN 3829447, Brooklyn, NY?
Owners, real estate professionals, contractors, buyers, attorneys, and lenders may search BIN 3829447, Brooklyn, NY when they see an OATH hearing, open DOB/ECB record, title issue, or upcoming transaction connected to the property.
Need a current record review for BIN 3829447, Brooklyn, NY?
The original hearing date has passed. Current agency records—not the old scheduled date—should control the next decision. Building Violation LLC can scope a paid current-status review and any follow-up work that the records support.
Request Current Status ReviewCall (866) 545-4440