Record 1: ECB Violation #39555406M — Stop Work Order / Continued Work
What the source record says
The public description for BIN 3843826, Brooklyn, NY states: “WORK WAS PERFORMED CONTRARY TO THE RESTRICTIONS OF THE STOP WORK ORDER. A PRIOR CSE REINSPECTION IDENTIFIED MISSING GUARDRAILS AT FLOORS 1 THROUGH 4 AND MISSING ROOF PROTECTION AT EXPOSURE 4. THE STOP WORK ORDE” Because the inspector identified a location within the premises, photos and repair proof should match that same area. The Stop Work Order timeline should be checked carefully, including service date, scope, and any allowed safety work or rescission. Site-safety proof should be dated because DOB focuses on conditions at the inspection time.
What this category usually means
The public record indicates work after, around, or in conflict with a Stop Work Order. DOB uses Stop Work Orders to stop activity until safety, permit, or compliance issues are addressed.
What a hearing on this record may have focused on
The hearing often turns on whether the order was active, what work was observed after service, who controlled the site, and whether the order was rescinded or partially rescinded.
Documents and proof worth reviewing now
- copy of the Stop Work Order
- photos by date
- permit records
- contractor logs
- proof of rescission or reinspection
Why this should not be ignored
Continued-work allegations can carry substantial penalties and keep a project frozen.
- 112 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER