Building Violation LLC
NYC OATH / ECB post-hearing property review

125 Bowery, Manhattan, NY 10002 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 125 Bowery, Manhattan, NY 10002 Call (866) 545-4440

Property and hearing summary

Property address125 Bowery, Manhattan, NY 10002
Hearing monthJuly 2026
BoroughManhattan
Block / Lot1-00304-0016
BIN1003931
Hearing records on this page11

Violation categories on this page: Work Without Permit / Unapproved Construction (8), Boiler / Heating Equipment (1), Electrical Work / Equipment (2).

Property-specific hearing analysis for 125 Bowery

The public source data placed this July 2026 DOB/ECB/OATH hearing at 125 Bowery, Manhattan, NY 10002. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 1003931 and BBL 1-00304-0016, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/09/2026 at 10:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 2, and the balance shown in the public extract is $1,250. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (8), Boiler / Heating Equipment (1), Electrical Work / Equipment (2). Manhattan properties frequently involve complex ownership, commercial space, high-density occupancy, and older DOB filings that should be checked before hearing preparation.

What the public violation language suggests

The public violation description for the first record states: OBSERVED APPROX. 85% OF THE EXISTING CUBICLES USED AS SLEEPING QUARTERS WAS REMOVED FROM THE 4TH & 5TH FLOOR WITHOUT A PERMIT., OBTAIN ALL PERMITS; CONTACT [email protected] FOR RE-INSPECTION.

Based on that wording, the practical preparation issues include the following:

  • The description uses no-permit or no-approval language, so showing an approved filing, later legalization, or removal is central.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 201: 28-105.1 WORK WITHOUT A PERMIT; 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER; 1D7: EC 250.4 FAILURE TO GROUND ELECTRICAL SYSTEMS.; 1C9: 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 125 Bowery, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 125 Bowery matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

What records should be reviewed now for this boiler / heating equipment matter at this property?

Useful records to review now include boiler inspection reports, service invoices, DOB boiler portal records, repair photos, affidavits from the service company, accepted filings, and proof that the cited boiler condition was corrected or administratively closed.

Why does a boiler / heating equipment violation at 125 Bowery matter?

Boiler violations can continue producing penalties, affect building operations, and create closing or refinancing problems if they remain unresolved.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39186914H — Work Without Permit / Unapproved Construction

Hearing date07/09/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date04/14/2026

Public violation description: OBSERVED APPROX. 85% OF THE EXISTING CUBICLES USED AS SLEEPING QUARTERS WAS REMOVED FROM THE 4TH & 5TH FLOOR WITHOUT A PERMIT., OBTAIN ALL PERMITS; CONTACT [email protected] FOR RE-INSPECTION.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 201: 28-105.1 WORK WITHOUT A PERMIT

ECB Violation #39187526K — Boiler / Heating Equipment

Hearing date07/16/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: OBSERVED IN THE BASEMENT BOILER ROOM BEING USED AS A STORAGE ROOM. ALSO, STORAGE AROUND GAS METER LOCATED IN CHINESE RESTAURANT. IN BASEMENT USING JIM CAPS ON WASTE LINES. THROUGHOUT THE BUILDING PIPE PENETRATI

What this cited issue means

This cited record concerns boiler or heating-equipment compliance. The public record indicates an issue with inspection reporting, boiler operation, maintenance documentation, or filing obligations that DOB expects to see corrected and documented.

What the hearing may have focused on

The hearing may focus on whether the boiler inspection was performed on time, whether required reports were filed correctly, whether the equipment is registered and serviceable, and whether the respondent has proof from a licensed professional or boiler agency.

Documents and proof worth reviewing now

Prepare boiler inspection reports, service invoices, DOB boiler portal records, repair photos, affidavits from the service company, accepted filings, and proof that the cited boiler condition was corrected or administratively closed.

Why this should not be ignored

Boiler violations can continue producing penalties, affect building operations, and create closing or refinancing problems if they remain unresolved.

Cited law / infraction references
  • 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

ECB Violation #39187525Z — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: OBSERVED ON THE FOURTH FLOOR SPRINKLER HEAD INSTALLED BACKWARDS. IN THE BATHROOM SINKS DOESN'T CLOSE. ON THE FIFTH FLOOR RADIATOR IS NOT SUPPORT PROPERLY AND SPRINKLER HEAD DAMAGED WHICH IS CONTRARY TO CODE SEC

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

ECB Violation #39187524R — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: OBSERVED THROUGH OUT THE BUILDING SPRINKLER HEADS OBSTRUCTED WHICH IS CONTRARY TO CODE SECTION BC 903.3.3, REPAIR AND/REPLACE

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

ECB Violation #39187494P — Electrical Work / Equipment

Hearing date07/16/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$4,800
Issue date05/06/2026

Public violation description: FAILURE TO GROUND ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT THAT THE MAIN BUILDING WATER GROUND CLAMP IS DEUTERATED COMPLETELY CORRODED POTENTIAL FOR FIRE ELECTRICAL SHOCK. EC 250.4 250.25 GROUNDING ELECTROD

What this cited issue means

This hearing appears to involve electrical work or equipment. The case may concern wiring, panels, service equipment, or electrical work performed without appropriate approval or inspection.

What the hearing may have focused on

The hearing may focus on whether electrical work was performed by a licensed electrician, whether an electrical application was filed, and whether the installation was inspected or made safe.

Documents and proof worth reviewing now

Prepare electrician invoices, permits, sign-offs, inspection records, photos, and any documentation showing removal or legalization of the cited work.

Why this should not be ignored

Electrical violations can create safety concerns and may stop related construction or permit closeout until corrected.

Cited law / infraction references
  • 1D7: EC 250.4 FAILURE TO GROUND ELECTRICAL SYSTEMS.

ECB Violation #39187511H — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ATOI I WAS GRANTED ACCESS TO SUBJECT LOCATION WHERE I OBSERVED CONCRET CEILING JOIST AT BASEMENT EXPOSURE 1 IN NEED OF REPAIR ALSO WOODEN CEILING JOIST AT 2

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

ECB Violation #39187523P — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: OBSERVED IN F & R TRADING STORE IN THE BASEMENT OPEN ENDED GAS LINE AND A FUTURE ON GAS LINE. ALSO A SPRINKLER HEAD NOT INSTALLED PROPERLY. BOXES OBSTRUCTING SPRINKLER HEADS SPRAY WHICH IS CONTRARY TO CODE SECT

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

ECB Violation #39187492L — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/06/2026

Public violation description: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED ON THE 2ND 3RD 4TH FLS INSTALLATION OF A/C SPILT UNIT DUCTLESS SYSTEM AND WIRING FOR SINGLE RMS NEW EMT PIPES FEED BOXES FOR POWER THRU OUT. 27-3018(B) ALL WORK MUST B

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 1C9: 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

ECB Violation #39187493N — Work Without Permit / Unapproved Construction

Hearing date07/16/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$1,600
Issue date05/06/2026

Public violation description: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED IN BATH RMS ON 3RD 4TH 5TH FLS NO GFCI INSTALLED WHERE SINKS ARE LOCATED. ALSO EXPOSED WIR

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 1D2: EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

ECB Violation #39187495R — Electrical Work / Equipment

Hearing date07/16/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$1,600
Issue date05/06/2026

Public violation description: FAILURE TO PROVIDE/MAINTAIN SUFFICIENT ACCESS/WORK SPACE ABOUT ELECTRICAL EQUIPMENT. OBSERVED IN THE BASEMENT THAT THE SERVICE EQUIPMENT IS BLOCKED AND COVERED WITH BOXES AND COMBUSTIBLE MATERIALS. POTENTINAL F

What this cited issue means

This hearing appears to involve electrical work or equipment. The case may concern wiring, panels, service equipment, or electrical work performed without appropriate approval or inspection.

What the hearing may have focused on

The hearing may focus on whether electrical work was performed by a licensed electrician, whether an electrical application was filed, and whether the installation was inspected or made safe.

Documents and proof worth reviewing now

Prepare electrician invoices, permits, sign-offs, inspection records, photos, and any documentation showing removal or legalization of the cited work.

Why this should not be ignored

Electrical violations can create safety concerns and may stop related construction or permit closeout until corrected.

Cited law / infraction references
  • 1D1: EC-MISC MICELLANEOUS VIOLATION OF ELECTRICAL CODE TECHNICAL STANDARDS

ECB Violation #39189053Z — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/18/2026

Public violation description: OBSERVED CUBICAL BEING INSTALLED AT 3RD FLOOR AND DEMOLISHED AT 5TH FLOOR. NO WORK ALLOWED TO CONSTRUCT OR DEMOLISH LIVING QUARTER CUBICAL SPACE. STOP THROUGHOUT ALL FLOORS OF THE PROPERTY (EXCEPT FOR EMERGENCY

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 101: 28-105.1 WORK WITHOUT A PERMIT

Related July 2026 property hearing records in Manhattan

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440