Building Violation LLC
NYC OATH / ECB post-hearing property review

157-60 12 Road, Queens, NY 11357 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 157-60 12 Road, Queens, NY 11357 Call (866) 545-4440

Property and hearing summary

Property address157-60 12 Road, Queens, NY 11357
Hearing monthJuly 2026
BoroughQueens
Block / Lot4-04559-0063
BIN4103747
Hearing records on this page5

Violation categories on this page: Work Without Permit / Unapproved Construction (4), Sidewalk / Public Right of Way (1).

Property-specific hearing analysis for 157-60 12 Road

The public source data placed this July 2026 DOB/ECB/OATH hearing at 157-60 12 Road, Queens, NY 11357. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 4103747 and BBL 4-04559-0063, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/28/2026 at 8:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 1, and the balance shown in the public extract is $2,500. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (4), Sidewalk / Public Right of Way (1). Queens properties often include one-family, two-family, mixed-use, and small commercial buildings where address, BIN, and occupancy records must be matched carefully.

What the public violation language suggests

The public violation description for the first record states: DURING INSPECTION OF A CONSTRUCTION SITE, I OBSERVED AN EXCAVATOR IN THE SITE, SOIL REMOVED AND WOOD FORMS IN PLACE AT THE FOUNDATION LEVEL, AFTER RESEARCH ON DOBNOW NO NOTIFICATION OF EARTHWORK PRIOR TO THE ST

Based on that wording, the practical preparation issues include the following:

  • The cited text should be read word-for-word because small wording differences can change whether the best response is proof of correction, legalization, dismissal evidence, or mitigation.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 111: BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK; 110: BC 3304.4,27-1032 FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION; 1F2: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3; 2P7. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 157-60 12 Road, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 157-60 12 Road matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

What records should be reviewed now for this sidewalk / public right of way matter at this property?

Useful records to review now include site photos, DOT/DOB permits, contractor invoices, surveys, restoration proof, inspection records, and correspondence with the relevant agency.

Why does a sidewalk / public right of way violation at 157-60 12 Road matter?

Right-of-way issues can delay construction, title review, and future permits if not resolved with the right agency documentation.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39554479Z — Work Without Permit / Unapproved Construction

Hearing date07/28/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/21/2026

Public violation description: DURING INSPECTION OF A CONSTRUCTION SITE, I OBSERVED AN EXCAVATOR IN THE SITE, SOIL REMOVED AND WOOD FORMS IN PLACE AT THE FOUNDATION LEVEL, AFTER RESEARCH ON DOBNOW NO NOTIFICATION OF EARTHWORK PRIOR TO THE ST

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 111: BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK

ECB Violation #39554476N — Work Without Permit / Unapproved Construction

Hearing date07/28/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$5,000
Issue date05/21/2026

Public violation description: NO PROTECTION FOR SIDES OF EXCAVATION AT EXPOSURE 1,2,3,& 4, NO 45 DEGREE SLOPE FOR SAFE EGRESS PROVIDED FOR WORKERS. THIS CREATES HAZARDOUS CAVED IN CONDITIONS DUE TO HEAVY RAIN. STOP ALL WORK UNDER APPLICATIO

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 110: BC 3304.4,27-1032 FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION

ECB Violation #39554477P — Work Without Permit / Unapproved Construction

Hearing date07/28/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeSite Safety
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/21/2026

Public violation description: AT TIME OF INSPECTION AND REQUEST FOR SUPPORT OF EXCAVATION DOCUMENTS THE GC WAS UNABLE TO PROVIDE. AT ALL TIMES DURING CONSTRUCTION APPROVED DRAWINGS MUST BE MAINTAINED ONSITE, TO SHOW FOR THE ACCURACY IN WHIC

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 1F2: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

ECB Violation #39554478R — Sidewalk / Public Right of Way

Hearing date07/28/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/21/2026

Public violation description: BC 3307.2.1 OBSERVED AN EXCAVATOR ON THE PROPERTY WITHOUT ANY DOT PERMITS. ANY TIME A MACHINE CROSSES A SIDEWALK TO BE STATIONED ON A PROPERTY A DOT PERMIT IS REQUIRED. RESEARCH OF DOT SYSTEM REVEALED THERE IS

What this cited issue means

This hearing appears to involve the sidewalk, curb, driveway, public right-of-way, or similar exterior frontage condition. The agency may require restoration, permit filing, or proof that the condition was legal.

What the hearing may have focused on

The hearing may focus on location, ownership responsibility, whether DOT/DOB permits were required, and whether the curb, sidewalk, or frontage was restored or legalized.

Documents and proof worth reviewing now

Prepare site photos, DOT/DOB permits, contractor invoices, surveys, restoration proof, inspection records, and correspondence with the relevant agency.

Why this should not be ignored

Right-of-way issues can delay construction, title review, and future permits if not resolved with the right agency documentation.

Cited law / infraction references
  • 2P7

ECB Violation #39554480X — Work Without Permit / Unapproved Construction

Hearing date07/28/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,000
Issue date05/21/2026

Public violation description: OBSERVED CONSTRUCTION FENCE AT EXPOSURE 1 WITH EXTERNAL DOOR HINGES THAT SWING OUTWARDS CONTRARY TO CODE REQUIREMENTS. OUTWARD SWINGING CONSTRUCTION FENCES CREATE OBSTRUCTION TO THE SIDEWALK AND PUT PEDESTRIAN

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 211: BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Related July 2026 property hearing records in Queens

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440