Building Violation LLC
NYC OATH / ECB post-hearing property review

18 Ludlam Place, Brooklyn, NY 11225 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 18 Ludlam Place, Brooklyn, NY 11225 Call (866) 545-4440

Property and hearing summary

Property address18 Ludlam Place, Brooklyn, NY 11225
Hearing monthJuly 2026
BoroughBrooklyn
Block / Lot3-01304-0077
BIN3034391
Hearing records on this page9

Violation categories on this page: Work Without Permit / Unapproved Construction (9).

Property-specific hearing analysis for 18 Ludlam Place

The public source data placed this July 2026 DOB/ECB/OATH hearing at 18 Ludlam Place, Brooklyn, NY 11225. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 3034391 and BBL 3-01304-0077, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/01/2026 at 8:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 1, and the balance shown in the public extract is $2,500. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (9). Brooklyn properties often involve older building stock, mixed residential/commercial use, and alteration histories that need careful DOB record review.

What the public violation language suggests

The public violation description for the first record states: AT TIME OF INSPECTION OBSERVED STAIRCASE REMOVED TO CELLAR AT INTERIOR AND ENTRY OF EXPO 2. ECB ISSUED FOR FAILURE TO MAINTAIN EGRESS AT CELLAR CAUSING UNSAFE CONDITIONS FOR OCCUPANTS AND EMERGENCY WORKERS. MAK

Based on that wording, the practical preparation issues include the following:

  • The cited condition appears to involve a cellar or basement area, which often receives close review because use, plumbing, egress, and occupancy rules are stricter below grade.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 189: 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR; 101: 28-105.1 WORK WITHOUT A PERMIT; 115: BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY; 1D2: EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 18 Ludlam Place, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 18 Ludlam Place matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39185632P — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED STAIRCASE REMOVED TO CELLAR AT INTERIOR AND ENTRY OF EXPO 2. ECB ISSUED FOR FAILURE TO MAINTAIN EGRESS AT CELLAR CAUSING UNSAFE CONDITIONS FOR OCCUPANTS AND EMERGENCY WORKERS. MAK

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 189: 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

ECB Violation #39185605J — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED CONSTRUCTION AT CELLAR, FIRST, AND SECOND FLOORS. ECB ISSUED FOR UNPERMITTED/UNDOCUMENTED WORK POSES SEVERE SAFETY HAZARD TO PROPERTY., OBTAIN PERMIT

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 101: 28-105.1 WORK WITHOUT A PERMIT

ECB Violation #39185601M — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED CELLAR EXCAVATED APPROXIMATELY 2 FEET. ECB ISSUED FOR UNPERMITTED/UNDOCUMENTED WORK POSES SEVERE STRUCTURAL HAZARD TO PROPERTY. STOP ALL WORK, BACKFILL, AND MAKE SAFE., OBTAIN PER

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 101: 28-105.1 WORK WITHOUT A PERMIT

ECB Violation #39185623N — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$5,000
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED FIRST FLOOR OPENING TO CELLAR WITHOUT PROTECTIONS. ECB ISSUED AS CONDITIONS POSES SEVERE FALLING HAZARD THAT COULD CAUSE INJURY. MAKE SITE SAFE., PROVIDE GUARD RAILS

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 115: BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

ECB Violation #39185621J — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$1,600
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED EXPOSED ELECTRICAL WIRING AND PANEL THROUGHOUT PROPERTY. ECB ISSUED FOR UNSAFE CONDITIONS POSES SHOCK HAZARD TO WORKERS AND EMERGENCY SERVICES., COMPLY WITH EC

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 1D2: EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

ECB Violation #39185602Y — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED STRUCTURAL DEMO AND CONSTRUCTION AT CELLAR, FIRST, AND SECOND FLOORS OF COLUMNS AND BEAMS. ECB ISSUED FOR UNPERMITTED/UNDOCUMENTED WORK POSES SEVERE STRUCTURAL HAZARD TO PROPERTY.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 101: 28-105.1 WORK WITHOUT A PERMIT

ECB Violation #39185613J — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED NEW ELECTRICAL WIRING THROUGHOUT PROPERTY. ECB ISSUED FOR UNPERMITTED/UNDOCUMENTED WORK POSES SEVERE ELECTRICAL HAZARD TO PROPERTY., OBTAIN PERMIT

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 1C9: 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

ECB Violation #39185630L — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED MISSING HANDRAIL TO STAIRCASE AT FIRST FLOOR TO SECOND FLOOR. ECB ISSUED FOR UNSAFE CONDITIONS FOUND ON WORK SITE. MAKE SITE SAFE., PROVIDE HANDRAILS ON STAIRWELL

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 120: BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

ECB Violation #39185619K — Work Without Permit / Unapproved Construction

Hearing date07/01/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date04/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE BUILT IN FRONT YARD NO ACTIVE PERMIT ON SITE FOR SCOPE OF WORK. ECB ISSUED FOR FAILURE TO RENEW CONSTRUCTION PERMIT., RENEW PERMIT

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 207: BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

Related July 2026 property hearing records in Brooklyn

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440