Building Violation LLC
NYC OATH / ECB post-hearing property review

2749 Creston Avenue, Bronx, NY 10468 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 2749 Creston Avenue, Bronx, NY 10468 Call (866) 545-4440

Property and hearing summary

Property address2749 Creston Avenue, Bronx, NY 10468
Hearing monthJuly 2026
BoroughBronx
Block / Lot2-03318-0147
BIN2017555
Hearing records on this page6

Violation categories on this page: Work Without Permit / Unapproved Construction (5), Facade / Exterior Wall Safety (1).

Property-specific hearing analysis for 2749 Creston Avenue

The public source data placed this July 2026 DOB/ECB/OATH hearing at 2749 Creston Avenue, Bronx, NY 10468. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 2017555 and BBL 2-03318-0147, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/31/2026 at 9:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 2, and the balance shown in the public extract is $1,000. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (5), Facade / Exterior Wall Safety (1). Bronx properties often require attention to HPD, DOB, and OATH records together because maintenance, boiler, facade, and permit issues may overlap.

What the public violation language suggests

The public violation description for the first record states: AT THE TIME OF INSPECTION OF A 2-STORY HOUSE UNDERGOING FULL DEMOLITION, I OBSERVED INADEQUATE CONSTRUCTION FENCE AT EXPOSURES #2-4, WITH CONSTRUCTION DEBRIS SPILLING ONTO ADJACENT PROPERTIES, CREATING A HAZARD

Based on that wording, the practical preparation issues include the following:

  • The cited text should be read word-for-word because small wording differences can change whether the best response is proof of correction, legalization, dismissal evidence, or mitigation.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 211: BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION; 109: BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP; 2P7; 179: AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 2749 Creston Avenue, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 2749 Creston Avenue matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

What records should be reviewed now for this facade / exterior wall safety matter at this property?

Useful records to review now include engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why does a facade / exterior wall safety violation at 2749 Creston Avenue matter?

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39554128R — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,000
Issue date05/13/2026

Public violation description: AT THE TIME OF INSPECTION OF A 2-STORY HOUSE UNDERGOING FULL DEMOLITION, I OBSERVED INADEQUATE CONSTRUCTION FENCE AT EXPOSURES #2-4, WITH CONSTRUCTION DEBRIS SPILLING ONTO ADJACENT PROPERTIES, CREATING A HAZARD

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 211: BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

ECB Violation #39554129Z — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$10,000
Issue date05/13/2026

Public violation description: 2-STORY HOUSE UNDERGOING FULL DEMOLITION, I OBSERVED DEMOLITION DEBRIS SPILLING ONTO ADJACENT PROPERTIES AT EXP#2-4. FURTHER OBSERVED FAILURE TO FOLLOW APPROVED DEMOLITION SEQUENCE AND FAILURE TO PROVIDE REQUIR

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 109: BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

ECB Violation #39554130X — Facade / Exterior Wall Safety

Hearing date07/31/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/13/2026

Public violation description: AT THE TIME OF INSPECTION 2-STORY HOUSE TO BE FULLY DEMOLISHED, I OBSERVED DEMOLITION WORKER ONGOING. I OBSERVED BROKEN GLASS ON ADJACENT PROPERTIES EXPOSURE #4. CREATING A HAZARDS CONDITION FOR WORKERS, TENANT

What this cited issue means

This hearing appears to involve facade, exterior wall, sidewalk shed, overhead protection, or exterior safety obligations. These cases often arise when DOB believes public protection or facade-related compliance was missing or incomplete.

What the hearing may have focused on

OATH may focus on whether adequate protection was installed, whether exterior-wall work or inspection obligations were timely, and whether the property had required professional documentation.

Documents and proof worth reviewing now

Prepare engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why this should not be ignored

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

Cited law / infraction references
  • 2P7

ECB Violation #39554126N — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/13/2026

Public violation description: AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE WITH DEMOLITION WORK, I OBSERVED USE OF A FIRE HYDRANT TO WASH CAR AND DEBRIS LEFT IN ADJACENT PROPERTY EXP#2. UPON REQUESTING, NO DEP PERMIT FOR HYDRANT USE WAS O

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 179: AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS

ECB Violation #39554127P — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/13/2026

Public violation description: AT TIME OF INSPECTION OF A 2-STORY HOUSE TO BE FULLY DEMO, I OBSERVED LARGE AMOUNT OF DEBRIS LEFT ONSITE, CREATING A UNSAFE WORKING CONDITION FOR WORKERS LEAD TO SLIP TRIP, FALL AND FIRE HAZARDS..STOP ALL WORK.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 181: BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

ECB Violation #39554474J — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$10,000
Issue date05/21/2026

Public violation description: AT THE TIME OF INSPECTION, AT A 2-FAMILY HOUSE APPROVED FOR FULL DEMOLITION, A FULL STOP WORK ORDER UNDER COMPLAINT #2440706 DATED 05/13/2026 REMAINED IN EFFECT. I OBSERVED DEMOLITION COMPLETED AND THE LOT GRAD

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 112: 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Related July 2026 property hearing records in Bronx

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440