Building Violation LLC
NYC OATH / ECB post-hearing property review

300 West 103 Street, Manhattan, NY 10025 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 300 West 103 Street, Manhattan, NY 10025 Call (866) 545-4440

Property and hearing summary

Property address300 West 103 Street, Manhattan, NY 10025
Hearing monthJuly 2026
BoroughManhattan
Block / Lot1-01890-0024
BIN1057182
Hearing records on this page7

Violation categories on this page: Work Without Permit / Unapproved Construction (6), Facade / Exterior Wall Safety (1).

Property-specific hearing analysis for 300 West 103 Street

The public source data placed this July 2026 DOB/ECB/OATH hearing at 300 West 103 Street, Manhattan, NY 10025. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 1057182 and BBL 1-01890-0024, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/23/2026 at 10:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 2, and the balance shown in the public extract is $1,250. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (6), Facade / Exterior Wall Safety (1). Manhattan properties frequently involve complex ownership, commercial space, high-density occupancy, and older DOB filings that should be checked before hearing preparation.

What the public violation language suggests

The public violation description for the first record states: 15 STORY ALT2 FACADE WORK ACTIVE SITE.OBSERVED SUSPENDED SCAFFOLD IN PLACE/USE EXP#1,3 WITH ANGLED TIEBACKS ATTACHED TO PARAPET WALL.UPON REQUEST TO RIGGER FOR DOCUMENTS PULL TEST STAMPED BY ENGINEER WITH PHOTO

Based on that wording, the practical preparation issues include the following:

  • The record references exterior safety or public protection, which can require professional or contractor proof.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 2F7: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3; 261: BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO; 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 300 West 103 Street, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 300 West 103 Street matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

What records should be reviewed now for this facade / exterior wall safety matter at this property?

Useful records to review now include engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why does a facade / exterior wall safety violation at 300 West 103 Street matter?

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39554111K — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY ALT2 FACADE WORK ACTIVE SITE.OBSERVED SUSPENDED SCAFFOLD IN PLACE/USE EXP#1,3 WITH ANGLED TIEBACKS ATTACHED TO PARAPET WALL.UPON REQUEST TO RIGGER FOR DOCUMENTS PULL TEST STAMPED BY ENGINEER WITH PHOTO

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 2F7: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

ECB Violation #39554108J — Facade / Exterior Wall Safety

Hearing date07/23/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeCranes and Derricks
Source record status (at extract)ACTIVE
Source-listed balance$800
Issue date05/13/2026

Public violation description: 15 STORY FACADE ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLDING EQUIPMENT IN PLACE/USE AT EXP#1,3. UPON RESEARCH ON DEPARTMENT RECORDS, NO SUSPENDED SCAFFOLD NOTIFICATION TO THE DEPARTMENT OF BUILDINGS 2

What this cited issue means

This hearing appears to involve facade, exterior wall, sidewalk shed, overhead protection, or exterior safety obligations. These cases often arise when DOB believes public protection or facade-related compliance was missing or incomplete.

What the hearing may have focused on

OATH may focus on whether adequate protection was installed, whether exterior-wall work or inspection obligations were timely, and whether the property had required professional documentation.

Documents and proof worth reviewing now

Prepare engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why this should not be ignored

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

Cited law / infraction references
  • 261: BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO

ECB Violation #39554110Z — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD IN PLACE/USE EXP#1,3 WITH PARAPET CLAMPS TIEBACKS. UPON REQUEST TO RIGGER FOR STAMPED ENGINEER PARAPET STABILITY LETTER FOR SAFE USE OF EQUIPME

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 2F7: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

ECB Violation #39554113Y — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY ALT2 FACADE WORK ACTIVE SITE.OBSERVED SIDEWALK SHED IN PLACE AT EXP#1,4 INSTALLED CONTRARY TO PLANS. AT EXP#4 MISSING RED LIGHT AT FIRE DEPARTMENT STANDPIPE CONNECTION. ALSO 4 FT HORIZONTAL BAR PARTIAL

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

ECB Violation #39554109L — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY FACADE ALT2 ACTIVE SITE. SUSPENDED SCAFFOLDS IN USE/PLACE AT EXP#1,3. WORK CONTRARY TO PLANS/SITE CONDITIONS. OBSERVED SCAFFOLD SETUP IN FRONT OF CORNICE MULTIPLE WIRE ROPES THRU HOLE NOT PROTECTED/LIF

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

ECB Violation #39554112M — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS/DETAILS SHOW FOR TREE PROTECTION TO BE PROVIDED AS PER PLANS/CODE 3309.11. NO TREE PROTECTION OBSERVED AT EXP#1,4 AS REQUIRED.P

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

ECB Violation #39554107H — Work Without Permit / Unapproved Construction

Hearing date07/23/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/13/2026

Public violation description: 15 STORY ALT2 FACADE WORK ACTIVE SITE.OBSERVED SUSPENDED SCAFFOLDING TEMPORARY EQUIPMENT INSTALLED WITH WIRE ROPES ATTACHED TO PLATFORM AT EXP#2,3 FOR USE UPON REVIEW OF SITE SAFETY PLANS/DETAILS SHOW OVERHEAD/

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

Related July 2026 property hearing records in Manhattan

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440