Building Violation LLC
NYC OATH / ECB post-hearing property review

428 East 149 Street, Bronx, NY 10455 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 428 East 149 Street, Bronx, NY 10455 Call (866) 545-4440

Property and hearing summary

Property address428 East 149 Street, Bronx, NY 10455
Hearing monthJuly 2026
BoroughBronx
Block / Lot2-02293-0042
BIN2000534
Hearing records on this page8

Violation categories on this page: Work Without Permit / Unapproved Construction (6), Occupancy / Use / Egress (1), Unknown / DOB Hearing (1).

Property-specific hearing analysis for 428 East 149 Street

The public source data placed this July 2026 DOB/ECB/OATH hearing at 428 East 149 Street, Bronx, NY 10455. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 2000534 and BBL 2-02293-0042, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/31/2026 at 8:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 1, and the balance shown in the public extract is $2,500. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (6), Occupancy / Use / Egress (1), Unknown / DOB Hearing (1). Bronx properties often require attention to HPD, DOB, and OATH records together because maintenance, boiler, facade, and permit issues may overlap.

What the public violation language suggests

The public violation description for the first record states: AT TIME OF INSPECTION WORK DOES NOT CONFORM TO THE APPROVED DRAWINGS OBSERVED EXISTING WALL MORE THAN 20 FT IN HEIGHT AT EXP#1 #3 NOT SUPPORTED / BRACED. CREATES IMMEDIATE HAZARDS. STOP ALL WORK ON SITE INSTA

Based on that wording, the practical preparation issues include the following:

  • The cited text should be read word-for-word because small wording differences can change whether the best response is proof of correction, legalization, dismissal evidence, or mitigation.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 182: 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV; 211: BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION; 2P7; 2F7: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 428 East 149 Street, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this work without permit / unapproved construction matter at this property?

Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why does a work without permit / unapproved construction violation at 428 East 149 Street matter?

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

What records should be reviewed now for this occupancy / use / egress matter at this property?

Useful records to review now include Certificate of Occupancy records, floor plans, photos after correction, lease or occupancy documents, permits, and professional statements where needed.

Why does a occupancy / use / egress violation at 428 East 149 Street matter?

Use and occupancy violations can affect tenants, lending, insurance, sale transactions, and future DOB filings.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #39554633H — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION WORK DOES NOT CONFORM TO THE APPROVED DRAWINGS OBSERVED EXISTING WALL MORE THAN 20 FT IN HEIGHT AT EXP#1 #3 NOT SUPPORTED / BRACED. CREATES IMMEDIATE HAZARDS. STOP ALL WORK ON SITE INSTA

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 182: 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

ECB Violation #39554609H — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,000
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE MISSING AT EXPOSURE#3 CREATES UNAUTHORIZED ACCESS FOR PUBLIC TO ENTER SITE. STOP ALL WORK ALLOWED TO INSTALLED CONSTRUCTION FENCE EXP#3 TO PREVENT UNAUTHORIZED

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 211: BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

ECB Violation #39554653P — Occupancy / Use / Egress

Hearing date07/31/2026
Hearing time10:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/22/2026

Public violation description: 3303.4.10 AT TIME OF INSPECTION OBSERVED ON SITE THERE ARE NO SECONDARY MEANS OF EGRESS. MEANS OF EGRESS WERE OBSTRUCTED BY MATERIALS PLYWOOD STOP ALL WORK PROVIDE SECONDARY MEANS OF EGRESS

What this cited issue means

This cited record concerns how space at the property is used or occupied. DOB may be alleging illegal conversion, cellar/basement occupancy, blocked egress, or use inconsistent with the Certificate of Occupancy or records.

What the hearing may have focused on

The hearing may focus on room layout, use, occupancy, egress, photographs taken during inspection, and whether the condition was removed or legalized.

Documents and proof worth reviewing now

Prepare Certificate of Occupancy records, floor plans, photos after correction, lease or occupancy documents, permits, and professional statements where needed.

Why this should not be ignored

Use and occupancy violations can affect tenants, lending, insurance, sale transactions, and future DOB filings.

Cited law / infraction references
  • 2P7

ECB Violation #39554634J — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 1
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED CMU WALL INSTALLED AT EXP# 3 NOT SHOWN ON DRAWINGS. STOP ALL WORK EXP#3 AND , INSTALLATION OF CMU WALL EXP#3. AMENDED DRAWINGS TO REFLECT SITE CONDITIONS.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 182: 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

ECB Violation #39554628N — Unknown / DOB Hearing

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeUnknown
Source record status (at extract)ACTIVE
Source-listed balance$2,500
Issue date05/22/2026

Public violation description: BC 3309.9 AT TIME OF INSPECTION OBSERVED NO WATERPROOFING AT EXP#2 #4 ADJ. PROPERTY PARTY WALLS AS REQUIRED BY CODE. STOP ALL WORK EXP# 2 EXP#4 INSTALLED WATERPROOFING.

What this cited issue means

This hearing involves a public DOB/ECB/OATH violation record tied to this property. The public description and cited law determine what evidence is needed and whether the matter is primarily technical, administrative, safety-related, or permit-related.

What the hearing may have focused on

The hearing may focus on whether the condition existed, whether the cited respondent is responsible, whether required documents were filed, and whether correction occurred when reviewing the record date.

Documents and proof worth reviewing now

Prepare the violation notice, photos, permits, professional letters, invoices, DOB/BIS/DOBNOW records, and any agency correspondence showing correction or legal status.

Why this should not be ignored

Even when a condition has been physically corrected, the public violation may remain open until the proper proof and certification steps are completed.

Cited law / infraction references
  • 2P7

ECB Violation #39554647Z — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED TEMPORARY BRACING AT CELLAR UPON REQUESTING FOR DRAWINGS TO REVIEW SITE CONDITION NONE WERE PROVIDED. PROVIDED AND MAINTAINED ALL DOCUMENTS ON SITE.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 2F7: BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

ECB Violation #39554652N — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time9:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED ACCUMULATION OF EXCESSIVE ACCUMULATION ON DEBRIS AND MATERIAL AT SITE. CREATES POTENTIAL TRIPPING HAZARD.

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 212: BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

ECB Violation #39554624X — Work Without Permit / Unapproved Construction

Hearing date07/31/2026
Hearing time8:30 AM
Source hearing status (at extract)PENDING
SeverityCLASS - 2
Violation typeConstruction
Source record status (at extract)ACTIVE
Source-listed balance$1,250
Issue date05/22/2026

Public violation description: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1 NOT CONFORMING TO THE APPROVED DRAWINGS. DRAWING SHOW SIDEWALK SHED HEIGHT 8FT ALSO MISSING CROSS BRACINGS. STOP ALL USED OF SIDEWALK SHED DECK,

What this cited issue means

This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.

What the hearing may have focused on

A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.

Documents and proof worth reviewing now

Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.

Why this should not be ignored

Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.

Cited law / infraction references
  • 282: 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

Related July 2026 property hearing records in Bronx

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440