Need to know what happened after the hearing?
Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.
Review Current Status for 532 West 122 Street, Manhattan, NY 10027 Call (866) 545-4440
Property and hearing summary
Violation categories on this page: Work Without Permit / Unapproved Construction (3), Stop Work / Unsafe Condition (2).
Property-specific hearing analysis for 532 West 122 Street
The public source data placed this July 2026 DOB/ECB/OATH hearing at 532 West 122 Street, Manhattan, NY 10027. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 1059667 and BBL 1-01976-0056, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.
The first listed hearing record on this page was scheduled for 07/16/2026 at 9:30 AM. The historical source status shown in the source data was PENDING, the severity is CLASS - 1, and the balance shown in the public extract is $6,250. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.
The violation categories summarized on this page are: Work Without Permit / Unapproved Construction (3), Stop Work / Unsafe Condition (2). Manhattan properties frequently involve complex ownership, commercial space, high-density occupancy, and older DOB filings that should be checked before hearing preparation.
What the public violation language suggests
The public violation description for the first record states: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #37025596L ISSUED ON 10-11-2023 FOR UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER., COMPLY WITH COMMISSIONER'S ORDER
Based on that wording, the practical preparation issues include the following:
- The cited text should be read word-for-word because small wording differences can change whether the best response is proof of correction, legalization, dismissal evidence, or mitigation.
This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.
Code and documentation notes for this address
The cited law or infraction references appearing in the public records for this property include 187: 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER; 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER; 1Q3. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.
For 532 West 122 Street, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?
If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.
Questions specific to this property and violation category
What records should be reviewed now for this work without permit / unapproved construction matter at this property?
Useful records to review now include permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.
Why does a work without permit / unapproved construction violation at 532 West 122 Street matter?
Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.
What records should be reviewed now for this stop work / unsafe condition matter at this property?
Useful records to review now include photographs, contractor proposals, repair invoices, engineer or architect letters, DOB inspection results, rescission documents, and proof that unsafe conditions were stabilized.
Why does a stop work / unsafe condition violation at 532 West 122 Street matter?
Unsafe-condition and Stop Work matters can escalate quickly and may affect active jobs, occupancy, insurance, and enforcement exposure.
July 2026 hearing records and category-specific explanations
Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.
ECB Violation #39187881P — Work Without Permit / Unapproved Construction
Public violation description: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #37025596L ISSUED ON 10-11-2023 FOR UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER., COMPLY WITH COMMISSIONER'S ORDER
What this cited issue means
This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.
What the hearing may have focused on
A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.
Documents and proof worth reviewing now
Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.
Why this should not be ignored
Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.
- 187: 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB Violation #39187882R — Work Without Permit / Unapproved Construction
Public violation description: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39085476Y ISSUED ON 05-04-2023 FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT-MANNER., REPAIR AND/REPLACE
What this cited issue means
This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.
What the hearing may have focused on
A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.
Documents and proof worth reviewing now
Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.
Why this should not be ignored
Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.
- 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB Violation #39187879X — Stop Work / Unsafe Condition
Public violation description: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #35693656P ISSUED ON 05-07-2025 FOR FAILURE TO MAINTAIN - PARKING STRUCTURE., COMPLY WITH CODE.
What this cited issue means
This hearing appears to involve an unsafe condition, Stop Work Order, or failure-to-maintain issue. DOB may be alleging that a condition at the property presented an immediate or significant compliance concern.
What the hearing may have focused on
The hearing may focus on site condition, ownership responsibility, corrective action, whether work continued after a Stop Work Order, and what proof shows the hazard was removed.
Documents and proof worth reviewing now
Prepare photographs, contractor proposals, repair invoices, engineer or architect letters, DOB inspection results, rescission documents, and proof that unsafe conditions were stabilized.
Why this should not be ignored
Unsafe-condition and Stop Work matters can escalate quickly and may affect active jobs, occupancy, insurance, and enforcement exposure.
- 1Q3
ECB Violation #39187880N — Work Without Permit / Unapproved Construction
Public violation description: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39103878N ISSUED ON 01-21-2024 FOR FAILURE TO MAINTAIN BUILD, REPAIR AND/REPLACE
What this cited issue means
This cited record concerns work DOB alleges was performed before approval, without a permit, or outside the scope of an approved filing. It may involve construction, demolition, plumbing, mechanical, electrical, curb work, or alteration activity observed at the property.
What the hearing may have focused on
A hearing on this type of record may have turned on whether the work existed, whether a valid DOB permit or LAA covered the condition, whether the cited respondent controlled the property, and whether the work was removed, legalized, or brought into compliance.
Documents and proof worth reviewing now
Prepare permit records, job filings, approved plans, contractor invoices, before-and-after photos, legalized work documentation, DOBNOW/BIS screenshots, and a Certificate of Correction plan.
Why this should not be ignored
Unpermitted-work violations can block future approvals, trigger additional inspections, increase penalties, and complicate sales, lending, and insurance reviews.
- 102: 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB Violation #35729836Y — Stop Work / Unsafe Condition
Public violation description: FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 5 LEVELS, OBSERVED A SPALLED CONCRETE BEAM AT 4TH LEVEL/CRACKED CONCRETE BEAM AT 4TH
What this cited issue means
This hearing appears to involve an unsafe condition, Stop Work Order, or failure-to-maintain issue. DOB may be alleging that a condition at the property presented an immediate or significant compliance concern.
What the hearing may have focused on
The hearing may focus on site condition, ownership responsibility, corrective action, whether work continued after a Stop Work Order, and what proof shows the hazard was removed.
Documents and proof worth reviewing now
Prepare photographs, contractor proposals, repair invoices, engineer or architect letters, DOB inspection results, rescission documents, and proof that unsafe conditions were stabilized.
Why this should not be ignored
Unsafe-condition and Stop Work matters can escalate quickly and may affect active jobs, occupancy, insurance, and enforcement exposure.
- 1Q3
Related July 2026 property hearing records in Manhattan
These same-month property records may be useful when reviewing related public hearing data in the same borough.
Need help determining the current status?
Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.
Request a Current OATH / Violation Status Review Call (866) 545-4440