Building Violation LLC
NYC OATH / ECB post-hearing property review

94-24 58 Avenue, Queens, NY 11373 — NYC OATH Hearing & Violation Status Review

The scheduled OATH hearing date listed for this property has passed. The date alone does not establish the disposition; current OATH and DOB records should be reviewed to determine the present status and any next steps.

Need to know what happened after the hearing?

Building Violation LLC can review available current property, summons, OATH, DOB and related agency records, then identify an appropriate paid scope for further assistance. No hearing outcome is assumed from the date shown on this page.

Review Current Status for 94-24 58 Avenue, Queens, NY 11373 Call (866) 545-4440

Property and hearing summary

Property address94-24 58 Avenue, Queens, NY 11373
Hearing monthJuly 2026
BoroughQueens
Block / Lot4-01911-0001
BIN4047257
Hearing records on this page1

Violation categories on this page: Facade / Exterior Wall Safety (1).

Property-specific hearing analysis for 94-24 58 Avenue

The public source data placed this July 2026 DOB/ECB/OATH hearing at 94-24 58 Avenue, Queens, NY 11373. For searchers reviewing this address, the important point is not just that a hearing exists; it is that the record ties the hearing to BIN 4047257 and BBL 4-01911-0001, which are the identifiers typically used when comparing DOB, OATH, title, permit, and closing records.

The first listed hearing record on this page was scheduled for 07/28/2026 at 9:00 AM. The historical source status shown in the source data was DEFAULT, the severity is CLASS - 2, and the balance shown in the public extract is $6,250. Because that source extract predates the hearing, the displayed status and balance should not be treated as the current OATH or DOB disposition.

The violation categories summarized on this page are: Facade / Exterior Wall Safety (1). Queens properties often include one-family, two-family, mixed-use, and small commercial buildings where address, BIN, and occupancy records must be matched carefully.

What the public violation language suggests

The public violation description for the first record states: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#812244.REMEDY:FILE ACCEPTABLE REPORT.

Based on that wording, the practical preparation issues include the following:

  • The record references exterior safety or public protection, which can require professional or contractor proof.
  • The description suggests a filing or reporting obligation, so portal records and accepted submissions are especially important.

This is why a property owner, broker, attorney, contractor, or managing agent should not treat the hearing as a simple fine notice. The wording of the description, the cited law section, the hearing status, and the existing DOB record all affect whether the best approach is dismissal evidence, mitigation, correction, permit legalization, professional documentation, or a Certificate of Correction strategy.

Code and documentation notes for this address

The cited law or infraction references appearing in the public records for this property include 227: 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA. Those references should be compared against current DOB NOW, BIS, OATH, permit, inspection, and professional records when reviewing the present status. A code reference by itself does not tell the whole story; the supporting facts are usually found in photos, inspector notes, permit history, filings, and correction documentation.

For 94-24 58 Avenue, a useful review should start with three questions: First, what exactly did the inspector observe? Second, was there already a permit, filing, report, or professional inspection that covered the condition? Third, if the condition was corrected after the violation was issued, what proof now exists to document correction or support any available post-hearing process?

If the record involves multiple violations at the same BBL, they should be reviewed together. One permit, one contractor visit, one professional inspection, or one correction package may affect more than one open item, but the evidence still has to be organized around each individual ECB violation number.

Questions specific to this property and violation category

What records should be reviewed now for this facade / exterior wall safety matter at this property?

Useful records to review now include engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why does a facade / exterior wall safety violation at 94-24 58 Avenue matter?

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

July 2026 hearing records and category-specific explanations

Each record below is shown with public record details, followed by an explanation tailored to the public description, violation category, code reference, and post-hearing status and compliance issues.

ECB Violation #37022355R — Facade / Exterior Wall Safety

Hearing date07/28/2026
Hearing time9:00 AM
Source hearing status (at extract)DEFAULT
SeverityCLASS - 2
Violation typeLocal Law
Source record status (at extract)ACTIVE
Source-listed balance$6,250
Issue date10/08/2021

Public violation description: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#812244.REMEDY:FILE ACCEPTABLE REPORT.

What this cited issue means

This hearing appears to involve facade, exterior wall, sidewalk shed, overhead protection, or exterior safety obligations. These cases often arise when DOB believes public protection or facade-related compliance was missing or incomplete.

What the hearing may have focused on

OATH may focus on whether adequate protection was installed, whether exterior-wall work or inspection obligations were timely, and whether the property had required professional documentation.

Documents and proof worth reviewing now

Prepare engineer reports, FISP or facade filings, shed permits, protection plans, photographs, contractor records, repair proposals, and proof that public protection was provided where required.

Why this should not be ignored

Exterior safety violations can be treated seriously because they may affect pedestrians, neighboring property, and public right-of-way safety.

Cited law / infraction references
  • 227: 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA

Related July 2026 property hearing records in Queens

These same-month property records may be useful when reviewing related public hearing data in the same borough.

Need help determining the current status?

Building Violation LLC can review current available records, identify the present procedural and compliance status, and define an appropriate paid scope for further research, hearing follow-up, correction, filing, inspection, or closeout assistance.

Request a Current OATH / Violation Status Review Call (866) 545-4440