DOB & ECB Violations at 500 Lenox Avenue, Manhattan, NY 10037
Public DOB/ECB violation information connected to this property address, intended for property owners, realtors, buyers, attorneys, contractors, and property managers researching this location.
Need help resolving a DOB/ECB violation at this property?
Building Violation LLC helps with ECB/OATH violations, DOB violations, hearings, permits, correction work coordination, penalties, and Certificates of Correction.
Call (866) 545-4440 Email [email protected]Property location
| Actual property address | 500 Lenox Avenue, Manhattan, NY 10037 |
|---|---|
| Borough | Manhattan |
| BIN | 1053899 |
| Block/Lot | 1734/1 |
| Number of listed violations | 3 |
| Severity | CLASS - 1 |
Violation details and category-specific explanation
Each violation below includes a tailored explanation based on the violation category, cited law section, and public DOB/ECB description. The actual correction strategy depends on the property condition and DOB/OATH record.
Construction Site Safety Violation
| ECB violation number | 39549800J |
|---|---|
| Status | ACTIVE |
| Severity | CLASS - 1 |
| Hearing date | 07/23/2026 |
| Hearing time | 8:30 AM |
| Issue date | 02/01/2026 |
| Balance due | 5,000 |
AT TIME OF INSPECTION, SIDEWALK SHED WAS NOT MAINTAINED IN A SAFE, CODE COMPLIANT MANNER. OBSERVED SHARP EDGES AND EXPOSED BOLTS AND SCREWS WITHOUT SAFETY CAPS, ROTTEN MUD SILLS AND STORED PLANKS AT SHED BRIDGE
What this specific category means
This violation points to site-safety requirements such as overhead protection, guardrails, standpipes, sidewalk sheds, housekeeping, worker safety training, accident notification, construction superintendent duties, or protection of people and property during construction.
Typical correction path
The correction usually requires site-safety review, immediate physical correction at the job site, contractor documentation, photos, safety logs or reports, and DOB submission showing the condition was corrected.
Why it matters
Site-safety violations should be treated quickly because DOB can classify them as hazardous and they can affect whether work may continue.
- Law section not listed in source file.
Construction Site Safety Violation
| ECB violation number | 39550632H |
|---|---|
| Status | ACTIVE |
| Severity | CLASS - 1 |
| Hearing date | 07/28/2026 |
| Hearing time | 8:30 AM |
| Issue date | 02/19/2026 |
| Balance due | 10,000 |
ATOI OF AN 18-STORY MAJOR BUILDING,@ ROOF LEVEL CONSTRUCTION WORK IN PROGRESS & SUPPORTED SCAFFOLD OBSERVED @ EXPOSURE #2/3&4. UPON REQUEST FOR SITE SAFETY MANAGER AS REQUIRED FOR CONSTRUCTION OPERATION NO DESI
What this specific category means
This violation points to site-safety requirements such as overhead protection, guardrails, standpipes, sidewalk sheds, housekeeping, worker safety training, accident notification, construction superintendent duties, or protection of people and property during construction.
Typical correction path
The correction usually requires site-safety review, immediate physical correction at the job site, contractor documentation, photos, safety logs or reports, and DOB submission showing the condition was corrected.
Why it matters
Site-safety violations should be treated quickly because DOB can classify them as hazardous and they can affect whether work may continue.
- BC 3310.5,27-1009(D) FAIL TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED
Occupancy / Certificate of Occupancy Problem
| ECB violation number | 39550627N |
|---|---|
| Status | ACTIVE |
| Severity | CLASS - 1 |
| Hearing date | 07/28/2026 |
| Hearing time | 8:30 AM |
| Issue date | 02/19/2026 |
| Balance due | 5,000 |
AT TIME OF INSPECTION OF AN 18-STORY BUILDING, WORK WAS IN PROGRESS. AT ROOF LEVEL &SCAFFOLD WAS OBSERVED ERECTED AND IN USE. REVIEW OF BIS RECORDS REVEALED THAT THE SITE SAFETY MANAGER LICENSE (MALIK S HARRISO
What this specific category means
This violation indicates DOB believes the property is being occupied or used differently from the Certificate of Occupancy, approved plans, or legal DOB records.
Typical correction path
The correction depends on the facts: restore the legal use, obtain approval for the current use where possible, amend filings, or provide DOB with proof that the alleged illegal occupancy has been discontinued.
Why it matters
Occupancy violations are high-impact because they can interfere with sales, financing, insurance, tenant issues, and future permit approvals.
- MISC. CHAPTER 4 OF TITLE 28-UNLICENSED ACTIVITY ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITHOUT A REQUIRED LI
How Building Violation LLC can help
We review the violation record, identify the correction path, coordinate with licensed professionals where needed, prepare supporting documentation, assist with OATH/ECB hearing strategy, and help move the property toward DOB acceptance and closure.
Information is based on public records and may not reflect the current status of the case. Contact Building Violation LLC for a current review.