HomeBuilding Violation LLCBuildingViolation.com| (866) 545-4440 | [email protected]

DOB & ECB Violations at 536 Monroe Street, Brooklyn, NY 11221

Public DOB/ECB violation information connected to this property address, intended for property owners, realtors, buyers, attorneys, contractors, and property managers researching this location.

Need help resolving a DOB/ECB violation at this property?

Building Violation LLC helps with ECB/OATH violations, DOB violations, hearings, permits, correction work coordination, penalties, and Certificates of Correction.

Call (866) 545-4440 Email [email protected]

Property location

Actual property address536 Monroe Street, Brooklyn, NY 11221
BoroughBrooklyn
BIN3044798
Block/Lot1639/35
Number of listed violations3
SeverityCLASS - 1

Violation details and category-specific explanation

Each violation below includes a tailored explanation based on the violation category, cited law section, and public DOB/ECB description. The actual correction strategy depends on the property condition and DOB/OATH record.

Electrical Work / Unsafe Electrical Condition

ECB violation number39188108M
StatusACTIVE
SeverityCLASS - 1
Hearing date07/22/2026
Hearing time8:30 AM
Issue date05/11/2026
Balance due1,600
Inspector/case description:

ATOI, OBSERVED BUILDING UNDER PARTIAL DEMOLITION WHERE FLOORS, WALLS AND ROOF REMOVED AT CELLAR. OBSERVED UNSAFE/UNSUITABLE ELECTRICAL PANELS EXPOSED TO RAIN CAUSING A SEVERE HAZARD., COMPLY WITH EC; PROVIDE WE

What this specific category means

This violation concerns electrical work, equipment, wiring, grounding, electrical closets, or electrical installations that DOB or the electrical inspection unit believes are unpermitted, unsafe, unsuitable, or not code-compliant.

Typical correction path

The correction generally requires review by a licensed electrician, correction of unsafe wiring or equipment, permit or application filing where required, and proof acceptable to DOB or the electrical unit.

Why it matters

Electrical violations can be treated as safety-sensitive because of fire, shock, and occupancy risks.

Cited law/section description
  • EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Research the cited legal requirements:

NYC DOB EC 110.2(A)

See also the NYC Violation Resolution Reference Library. The listing above reflects a June 2026 record snapshot; confirm the present violation status with DOB/OATH.

Construction Site Safety Violation

ECB violation number39188107K
StatusACTIVE
SeverityCLASS - 1
Hearing date07/22/2026
Hearing time10:30 AM
Issue date05/11/2026
Balance due10,000
Inspector/case description:

CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. ATOI, 1) OBSERVED AT 3RD FLOOR MISSING GUARDRAILS CREATING FALL HAZARD. 2) IMPROPER SUPPORTED SCAFFOLD PLATFORMS OF 80 FT X 20 FT NOT FULLY PLANKED

What this specific category means

This violation points to site-safety requirements such as overhead protection, guardrails, standpipes, sidewalk sheds, housekeeping, worker safety training, accident notification, construction superintendent duties, or protection of people and property during construction.

Typical correction path

The correction usually requires site-safety review, immediate physical correction at the job site, contractor documentation, photos, safety logs or reports, and DOB submission showing the condition was corrected.

Why it matters

Site-safety violations should be treated quickly because DOB can classify them as hazardous and they can affect whether work may continue.

Cited law/section description
  • BC 3301.13.7 THRU BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.

DOB/ECB Violation

ECB violation number39188204M
StatusACTIVE
SeverityCLASS - 1
Hearing date07/22/2026
Hearing time10:30 AM
Issue date05/11/2026
Balance due5,000
Inspector/case description:

ATOI OBSERVED BUILDING UNDER PARTIAL DEMOLITION, SUPPORTED SCAFFOLD INSTALLED AT EXPOSURES 1 , 3, & 4. SCAFFOLDING PLATFORMS MISSINGB RAILINGS AND NOT FULLY PLANKED AS AS PER CODE CREATING A SEVERE FALL HAZARD

What this specific category means

This violation is tied to the cited DOB/ECB condition shown in the public record for this property. The exact correction depends on the cited law section, inspection notes, property condition, and whether permits or professional filings are required.

Typical correction path

The practical first step is to review the violation text, confirm whether the condition still exists, identify the responsible party, and determine whether DOB needs photos, permits, professional reports, or a Certificate of Correction.

Why it matters

Even when a violation looks minor, leaving it open can delay closings, refinancing, permits, and future property work.

Cited law/section description
  • Law section not listed in source file.

How Building Violation LLC can help

We review the violation record, identify the correction path, coordinate with licensed professionals where needed, prepare supporting documentation, assist with OATH/ECB hearing strategy, and help move the property toward DOB acceptance and closure.

Information is based on public records and may not reflect the current status of the case. Contact Building Violation LLC for a current review.