What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 3 Certificate of Correction / Commissioner Order summonses; 2 Other Building / Code Compliance summonses; Egress / Exit Obstruction; Failure to Maintain. The hearing dates are October 1, 2026, October 29, 2026; the source issue date(s) are April 10, 2026, August 25, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Other Building / Code Compliance — Summons 35727665J
CLASS - 2 · Issued April 10, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIALPURPOSES. DEPT OF BUILDINGS RECORDS INDICATE PREMISES TO BE LEGALLY APPROVED AS A CLASS "A" MULTIPLE DWELLING. ILLEGAL OCCUPANCY NOTED: AT A
Cited provision(s): 2F3 — BC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Egress / Exit Obstruction — Summons 35727666L
CLASS - 1 · Issued April 10, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE); FOR TRANSIENT USE
Cited provision(s): 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Failure to Maintain — Summons 35727667N
CLASS - 1 · Issued April 10, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF A SYSTEM OF AUTOMATIC SPRINKLER WHERE IS REQUIRED PER BC 903.2 AND 27-954, FOR TRANSIENT USE AT APT #4 ON 4TH FLOOR. REMEDY: DISCONTINUE ILLEGAL OC
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Other Building / Code Compliance — Summons 35727668P
CLASS - 1 · Issued April 10, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 907.2.8. FAILURE TO PROVIDE CLASS "J" FIRE ALARM SYSTEM FOR TRANSIENT USE AT APT #4 AT 4TH FLOOR. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY.
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Certificate of Correction / Commissioner Order — Summons 39201744R
CLASS - 2 · Issued August 25, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNABLE TO GAIN ACCESS TO APT 4. CERTIFICATE OF CORRECTION NOT SUBMITTED FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #35727668P ISSUED ON 4/10/2026 FOR REQUIRED CLASS "J" FIRE ALARM SYSTEM., FILE A CERTIFICATE OF
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Certificate of Correction / Commissioner Order — Summons 39201745Z
CLASS - 2 · Issued August 25, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNABLE TO GAIN ACCESS. CERTIFICATE OF CORRECTION NOT SUBMITTED FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #35727666L ISSUED ON 4/10/2026 FOR LACK OF REQUIRED MEANS OF EGRESS AT APARTMENT #4,TRANSIENT USED SPACE.
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Certificate of Correction / Commissioner Order — Summons 39201746K
CLASS - 2 · Issued August 25, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNABLE TO GAIN ACCESS. CERTIFICATE OF CORRECTION NOT SUBMITTED FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #35727667N ISSUED ON 4/10/2026 FOR LACK OF AUTOMATIC SPRINKLER SYSTEM FOR TRANSIENT USE OF APARTMENT #4.,
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Case-specific next step
For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.