BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1007146

Manhattan property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughManhattan
BIN1007146
Block / Lot00478 / 0028
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035687409R (source ECB number 35687409R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35687408P
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING KENMARE STREET INSTALLED WITHOUT A PERMIT READING "OLLY: WHEN YOUR GUT NEEDS A PEP TALK. WE GOT YOU. WHEN YOUR BRAIN WON'T QUIT YAPPING. WE G 160 — §28-105.1 OUTDOOR AD CO SIGN ON DISPLAY STRUCTURE WITHOUT A PERMIT
35687409R
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING KENMARE STREET INSTALLED WITHOUT A PERMIT READING "OLLY: WHEN YOUR GUT NEEDS A PEP TALK. WE GOT YOU. WHEN YOUR BRAIN WON'T QUIT, YAPPIN: WE G 165 — ZR 32-63 OUTDOOR ADVERTISING COMPANY ADVERTISING SIGN NOT PERMITTED IN SPECIFIE
35687410Y
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 OWNER ACTING AS AN OUTDOOR ADVERTISING COMPANY WITHOUT REGISTRATION. OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING, KENMARE STREET DISPLAY ON 1ST FLOOR FACING, KENMARE STREET INSTALLED WI 1B2 — 28-502.2 OAC ENGAGED IN OUTDOOR ADVERTISING BUSINESS W/O VALID REQ

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Zoning / Parking / Use; Sign / Awning / Advertising. The hearing date is October 1, 2026; the source issue date(s) are March 16, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 35687408P

CLASS - 1 · Issued March 16, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING KENMARE STREET INSTALLED WITHOUT A PERMIT READING "OLLY: WHEN YOUR GUT NEEDS A PEP TALK. WE GOT YOU. WHEN YOUR BRAIN WON'T QUIT YAPPING. WE G

Cited provision(s): 160 — §28-105.1 OUTDOOR AD CO SIGN ON DISPLAY STRUCTURE WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Zoning / Parking / Use — Summons 35687409R

CLASS - 1 · Issued March 16, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING KENMARE STREET INSTALLED WITHOUT A PERMIT READING "OLLY: WHEN YOUR GUT NEEDS A PEP TALK. WE GOT YOU. WHEN YOUR BRAIN WON'T QUIT, YAPPIN: WE G

Cited provision(s): 165 — ZR 32-63 OUTDOOR ADVERTISING COMPANY ADVERTISING SIGN NOT PERMITTED IN SPECIFIE

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Sign / Awning / Advertising — Summons 35687410Y

CLASS - 1 · Issued March 16, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OWNER ACTING AS AN OUTDOOR ADVERTISING COMPANY WITHOUT REGISTRATION. OUTDOOR ADVERTISING SIGNS IN GLASS PANEL DISPLAY ON 1ST FLOOR FACING, KENMARE STREET DISPLAY ON 1ST FLOOR FACING, KENMARE STREET INSTALLED WI

Cited provision(s): 1B2 — 28-502.2 OAC ENGAGED IN OUTDOOR ADVERTISING BUSINESS W/O VALID REQ

How this type of condition is typically resolved

Sign-related charges usually require confirming zoning/permit requirements, dimensions, illumination and placement, followed by permit/legalization or removal/modification.

Hearing issues to verify

  • Was the sign/awning exempt from a permit or already covered by an approved filing?
  • Were the dimensions/location described by the inspector accurate?
  • Was the sign removed or modified before the summons date or hearing?

Evidence that may matter

  • Sign permit / zoning documents
  • Measured photographs and drawings
  • Removal or modification invoice
  • Prior approvals and storefront plans

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.