What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Certificate of Correction / Commissioner Order; Other Building / Code Compliance. The hearing dates are October 1, 2026, October 9, 2026; the source issue date(s) are February 9, 2026, July 23, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Certificate of Correction / Commissioner Order — Summons 39556953X
CLASS - 2 · Issued July 23, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, THE 25-STORY BUILDING SITE WAS CLOSED WITH NO CONSTRUCTION ACTIVITY OBSERVED. A REVIEW OF DEPARTMENT RECORDS FOUND A FAILURE TO FILE CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILD
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Other Building / Code Compliance — Summons 35717895X
CLASS - 2 · Issued February 9, 2026; hearing October 9, 2026. · Hearing status: PENDING
DOB allegation in the source extract: TEMPORARY CONSTRUCTION EQUIPMENT ONSITE;EXPIRED PERMIT.AS NOTED AT THETIME OF INSPECTION FENCE PERMIT WAS EXPIRED.REM:RENEW PERMIT.
Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.