October 2026 NYC DOB / OATH Hearing — BIN 1013689

Manhattan property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 15, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughManhattan
BIN1013689
Block / Lot00763 / 0045
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557735M (source ECB number 39557735M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557736Y
ACTIVE
October 15, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE IN PLACE. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS DETERMINED THAT CONSTRUCTION FENCE PERMIT M01178407-I1-FN EXPIRED ON 04/30/2026. RENEW THE REQUIRED PERMIT. 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
39557737X
ACTIVE
October 15, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE NOT PROPERLY MAINTAINED AND WITHOUT REQUIRED VIEWING PANELS, CONTRARY TO BC 3307.7.3. ADVERTISING WAS POSTED ON THE FENCE CONTRARY TO BC 3301.9.7, MAINTAIN FEN 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557735M
ACTIVE
October 15, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE WITHOUT THE REQUIRED PARAPET INFORMATION PANEL, CONTRARY TO BC 3301.9.2. PROVIDE AND MAINTAIN THE REQUIRED SIDEWALK SHED PARAPET INFORMATION PANEL.PROVIDE 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses; Construction Fence. The hearing date is October 15, 2026; the source issue date(s) are August 10, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Construction Fence — Summons 39557736Y

CLASS - 2 · Issued August 10, 2026; hearing October 15, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE IN PLACE. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS DETERMINED THAT CONSTRUCTION FENCE PERMIT M01178407-I1-FN EXPIRED ON 04/30/2026. RENEW THE REQUIRED PERMIT.

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.

Hearing issues to verify

  • Did the fence configuration on the inspection date match the approved/logistics plan?
  • Was the cited opening or defect temporary and promptly corrected?
  • Was a permit or construction-fence filing active where required?

Evidence that may matter

  • Approved construction-fence/site logistics documents
  • Dated photographs
  • Contractor logs and correction invoice
  • Permit/filing record

Sidewalk Shed / Scaffold — Summons 39557737X

CLASS - 2 · Issued August 10, 2026; hearing October 15, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE NOT PROPERLY MAINTAINED AND WITHOUT REQUIRED VIEWING PANELS, CONTRARY TO BC 3307.7.3. ADVERTISING WAS POSTED ON THE FENCE CONTRARY TO BC 3301.9.7, MAINTAIN FEN

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557735M

CLASS - 2 · Issued August 10, 2026; hearing October 15, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE WITHOUT THE REQUIRED PARAPET INFORMATION PANEL, CONTRARY TO BC 3301.9.2. PROVIDE AND MAINTAIN THE REQUIRED SIDEWALK SHED PARAPET INFORMATION PANEL.PROVIDE

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.