What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Other Building / Code Compliance. The hearing dates are October 15, 2026, October 22, 2026; the source issue date(s) are August 18, 2026, January 6, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39548835P
CLASS - 2 · Issued January 6, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: RESPONDED TO AN INCIDENT IN WHICH A WORKER WAS STRUCK ON THE WRIST BY A RESHORE POST WHILE RECEIVING IT FROM ANOTHER WORKER. INSPECTION REVEALED THAT THERE WERE NO SAFETY MEASURES IN PLACE FOR SAFE HANDLING OF
Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Other Building / Code Compliance — Summons 39558083K
CLASS - 1 · Issued August 18, 2026; hearing October 22, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION, IT WAS DETERMINED THAT THE GENERAL CONTRACTOR DID NOT SUBMIT THE REQUIRED INCIDENT INFORMATION THROUGH THE DEPARTMENT'S ELECTRONIC PORTAL WITHIN THREE BUSINESS DAYS OF THE JULY 29, 2026 C
Cited provision(s): 1M7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review