October 2026 NYC DOB / OATH Hearing — BIN 1015010

Manhattan property record with 8 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Failure to Maintain

BoroughManhattan
BIN1015010
Block / Lot00801 / 0030
October Records8
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035729377Y (source ECB number 35729377Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35729377Y
ACTIVE
October 1, 2026
8:30 AM
CLASS - 2 PENDING $3,125.00 ILLEGAL USE IN A MANUFACTURING DISTRICT. UNLICENSED PHYSICAL TREATMENTESTABLISHMENT. A PROHIBITED USE PER ZR 12-10 OPERATING IN A M1-6 ZONING DISTRICT. DOING BUSINESS AS "RENEW BODY & SPA" ON THE 1ST FLOOR WITH 248 — ZR 42-00 ILLEGAL USE IN A MANUFACTURING DISTRICT
35729378X
ACTIVE
October 1, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR ECB #35679106J ISSUED ON 5/13/24. REMEDY: FILE A CERTIFICATE OF CORRECTION. 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
35729380P
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS AT CELLAR LEVEL.CELLAR LEVEL ILLEGAL OCCUPIED/CONVERTED INTO SLEEPING HAVING LOUGE SOFTS AND BED(IN SEPARATE ROOM)AND PERSUANT ITEMS.REM:DISCONTINUE ILLEGAL OCC 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
35729381R
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF REQUIREDNUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366;BC 1021.1(2014 CODE);BC 1006.3(2022 CODE)FOR SLEEPING GEARS AT CEL 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
35729382Z
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM.NOTED:AT TIME OF INSPECTION AT CELLAR LEVEL HAVING CREATED A BEDROOM WITHOUT N 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
35729383K
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT AT CELLAR LEVEL AT 1ST FLOOR.NOTED:CREATED OPENING BETWEEN 1ST FLOOR AND CELLAR LEVEL WITH A STAIRCASE AND ERTECTED WALLS TO CREATE ROOM USED AS SLEEPING GTRS.REM:OBTAIN PERMITS. 101 — 28-105.1 WORK WITHOUT A PERMIT
35729384M
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ELECTRICAL WORK WITHOUT A PERMIT AT CELLAR LEVEL.NOTED:INSTALLED ELECTRIC STOVE AT CELLAR LEVEL(OUTLETS AND WIRING INSTALLED).INSTALLED HIGHEST LIGHT IN ROOM USED AS SLEELING GTRS).REM:OBTAIN PERMIT. 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
35729385Y
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3(2014 CODE);27-345,BC 711.2.4(2022 CODE)AT CELLAR LEVEL.NOTED 2 PENETRATIONS OBSERVED ABOVE DOOR AT STAIRWAY WITHOUT FIRESTOPPIN 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 2 Failure to Maintain summonses; 2 Work Without a Permit summonses; Zoning / Parking / Use; Certificate of Correction / Commissioner Order; Illegal Occupancy / Conversion; Egress / Exit Obstruction. The hearing date is October 1, 2026; the source issue date(s) are July 23, 2026, July 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Zoning / Parking / Use — Summons 35729377Y

CLASS - 2 · Issued July 23, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ILLEGAL USE IN A MANUFACTURING DISTRICT. UNLICENSED PHYSICAL TREATMENTESTABLISHMENT. A PROHIBITED USE PER ZR 12-10 OPERATING IN A M1-6 ZONING DISTRICT. DOING BUSINESS AS "RENEW BODY & SPA" ON THE 1ST FLOOR WITH

Cited provision(s): 248 — ZR 42-00 ILLEGAL USE IN A MANUFACTURING DISTRICT

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Certificate of Correction / Commissioner Order — Summons 35729378X

CLASS - 2 · Issued July 23, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR ECB #35679106J ISSUED ON 5/13/24. REMEDY: FILE A CERTIFICATE OF CORRECTION.

Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Illegal Occupancy / Conversion — Summons 35729380P

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS AT CELLAR LEVEL.CELLAR LEVEL ILLEGAL OCCUPIED/CONVERTED INTO SLEEPING HAVING LOUGE SOFTS AND BED(IN SEPARATE ROOM)AND PERSUANT ITEMS.REM:DISCONTINUE ILLEGAL OCC

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Egress / Exit Obstruction — Summons 35729381R

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF REQUIREDNUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366;BC 1021.1(2014 CODE);BC 1006.3(2022 CODE)FOR SLEEPING GEARS AT CEL

Cited provision(s): 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Failure to Maintain — Summons 35729382Z

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM.NOTED:AT TIME OF INSPECTION AT CELLAR LEVEL HAVING CREATED A BEDROOM WITHOUT N

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 35729383K

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT AT CELLAR LEVEL AT 1ST FLOOR.NOTED:CREATED OPENING BETWEEN 1ST FLOOR AND CELLAR LEVEL WITH A STAIRCASE AND ERTECTED WALLS TO CREATE ROOM USED AS SLEEPING GTRS.REM:OBTAIN PERMITS.

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35729384M

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT AT CELLAR LEVEL.NOTED:INSTALLED ELECTRIC STOVE AT CELLAR LEVEL(OUTLETS AND WIRING INSTALLED).INSTALLED HIGHEST LIGHT IN ROOM USED AS SLEELING GTRS).REM:OBTAIN PERMIT.

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 35729385Y

CLASS - 1 · Issued July 24, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3(2014 CODE);27-345,BC 711.2.4(2022 CODE)AT CELLAR LEVEL.NOTED 2 PENETRATIONS OBSERVED ABOVE DOOR AT STAIRWAY WITHOUT FIRESTOPPIN

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.