BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1016980

Manhattan property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 8, 2026, October 15, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Certificate of Correction / Commissioner Order

BoroughManhattan
BIN1016980
Block / Lot00860 / 0074
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198153K (source ECB number 39198153K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198153K
ACTIVE
October 8, 2026
10:30 AM
CLASS - 1 PENDING $4,000.00 AT TIME OF INSPECTION OBSERVED ELECTRICAL WIRING EXPOSED AND UNSAFE ALSO FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39151779Y ISSUED ON 06-23-2025 FOR UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUI 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39198154M
ACTIVE
October 8, 2026
8:30 AM
CLASS - 1 PENDING $6,250.00 AT TIME OF INSPECTION OBSERVED NO FIRE STOPPING AT AND HOLES IN ACCESS PANELS ALSO FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39151780L ISSUED ON 06-23-2025 FOR FAILURE TO MAINTAIN BUILDING IN CO 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
35730750L
ACTIVE
October 15, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED AT EXPOSURE #2 EAST ELEVATION, UNSECURED OBJECTS ON WINDOW SILL AT APPX 13TH FLOOR(TOP FLOOR). THIS CONDITI 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Certificate of Correction / Commissioner Order summonses; Façade / Exterior Wall. The hearing dates are October 15, 2026, October 8, 2026; the source issue date(s) are July 29, 2026, July 31, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Certificate of Correction / Commissioner Order — Summons 39198153K

CLASS - 1 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED ELECTRICAL WIRING EXPOSED AND UNSAFE ALSO FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39151779Y ISSUED ON 06-23-2025 FOR UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUI

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Certificate of Correction / Commissioner Order — Summons 39198154M

CLASS - 1 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED NO FIRE STOPPING AT AND HOLES IN ACCESS PANELS ALSO FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39151780L ISSUED ON 06-23-2025 FOR FAILURE TO MAINTAIN BUILDING IN CO

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Façade / Exterior Wall — Summons 35730750L

CLASS - 2 · Issued July 31, 2026; hearing October 15, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED AT EXPOSURE #2 EAST ELEVATION, UNSECURED OBJECTS ON WINDOW SILL AT APPX 13TH FLOOR(TOP FLOOR). THIS CONDITI

Cited provision(s): 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.