What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Demolition; Site Safety / Safeguarding. The hearing date is October 22, 2026; the source issue date(s) are August 13, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Demolition — Summons 39557878J
CLASS - 1 · Issued August 13, 2026; hearing October 22, 2026. · Hearing status: PENDING
DOB allegation in the source extract: RESPONDING TO AN INCIDENT WHERE A WORKER GOT INJURED UNDER HIS LEFT EYE WHILE REMOVING DEMOLITION DEBRIS FROM THE MEZZANINE TO THE DUMPSTER ON THE 1ST FLOOR. INSPECTION REVEALED THAT THE INCIDENT OCCURRED APPRO
Cited provision(s): 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records
Site Safety / Safeguarding — Summons 39557879L
CLASS - 2 · Issued August 13, 2026; hearing October 22, 2026. · Hearing status: PENDING
DOB allegation in the source extract: RESPONDING TO AN INCIDENT WHERE A WORKER GOT STRUCK FROM A METAL ROD UNDER HIS LEFT EYE, INSPECTION REVEALED THE WORKER WAS REMOVING DEMOLITION DEBRIS FROM THE MEZZANINE THROWING IT DOWN TO THE DUMPSTER ON TO T
Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.