BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1030942

Manhattan property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 8, 2026, October 22, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughManhattan
BIN1030942
Block / Lot01182 / 0049
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198674X (source ECB number 39198674X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198675H
ACTIVE
October 8, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED UNPERMITTED ELECTRICAL WORK BEING DONE INCLUDING NEW ELECTRICAL PANEL.PER B1C9 28-105.1 ELECTRICAL WORK WITHOUT A PERMIT., OBTAIN PERMIT 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39198674X
ACTIVE
October 8, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED UNCPPED GAS LINE, FIRE SPERATING WALL STRIPPED DOWN TO STUDS. PER BC 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER., REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39200363Z
ACTIVE
October 22, 2026
8:30 AM
CLASS - 2 PENDING $625.00 CAR SHUT DOOWN DURING INSPECTION. (8.6.5.8). PROVIDE EXPLICITLY DETAILED INFO, POSTED IN A CONSPICUOUS LOCATION, INDICATING HOW/WHERE TO OBTAIN KEYS TO BASEMENT/MACHINE ROOM. LISTED PHONE NUMBER ON MANAGEMENT O 251 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Failure to Maintain; Elevator / Vertical Transportation. The hearing dates are October 22, 2026, October 8, 2026; the source issue date(s) are August 12, 2026, July 31, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39198675H

CLASS - 1 · Issued July 31, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNPERMITTED ELECTRICAL WORK BEING DONE INCLUDING NEW ELECTRICAL PANEL.PER B1C9 28-105.1 ELECTRICAL WORK WITHOUT A PERMIT., OBTAIN PERMIT

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39198674X

CLASS - 2 · Issued July 31, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNCPPED GAS LINE, FIRE SPERATING WALL STRIPPED DOWN TO STUDS. PER BC 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER., REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Elevator / Vertical Transportation — Summons 39200363Z

CLASS - 2 · Issued August 12, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: CAR SHUT DOOWN DURING INSPECTION. (8.6.5.8). PROVIDE EXPLICITLY DETAILED INFO, POSTED IN A CONSPICUOUS LOCATION, INDICATING HOW/WHERE TO OBTAIN KEYS TO BASEMENT/MACHINE ROOM. LISTED PHONE NUMBER ON MANAGEMENT O

Cited provision(s): 251 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN

How this type of condition is typically resolved

Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.

Hearing issues to verify

  • Does the device number/location on the summons match the building's elevator record?
  • Was the cited defect repaired or the device removed from service before the inspection?
  • Were the required CAT/periodic inspection filings timely and accepted?

Evidence that may matter

  • Elevator device record and inspection/test reports
  • Maintenance contractor logs and repair tickets
  • Affirmation of Correction / reinspection result
  • Photographs or controller/service records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.