October 2026 NYC DOB / OATH Hearing — BIN 1041822

Manhattan property record with 9 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 8, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughManhattan
BIN1041822
Block / Lot01392 / 0025
October Records9
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557252H (source ECB number 39557252H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557249R
ACTIVE
October 8, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 OBS HYDRAULIC PUMP JACKS/SHORING POSTS SUPPORTING A TEMPORARY FREESTANDING FLOOR/STRUCTURAL ASSEMBLY NOT INDICATED ON THE DOB APPROVED PLANS.TEMP SUPPORT INSTALLATION WAS ERECTED&MAINTAINED WITHOUT APPROVED ENG 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
39557252H
ACTIVE
October 8, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 3301.6.4 OBS. MAKESHIFT WORK PLATFORMS CONSTRUCTED OF WOOD PLANKS SUPPORTED BY STRUCTURAL STEEL/SCAFFOLD MEMBERS. PLATFORM INSTALLATION DID NOT CONFORM TO APPROVED CONSTR. DOCS.; APPROVED SCAFFOLD COMPONENTS A 1P7
39557256P
ACTIVE
October 8, 2026
10:30 AM
CLASS - 2 PENDING $2,400.00 OBS. SIDEWALK SHED POSTS WITHIN AN ACTIVE VEHICULAR DRIVEWAY LACKED REQ'D HIGH VISIBILITY MARKINGS. UNMARKED POSTS CREATED AN IMPACT HAZARD TO VEHICLES ENTERING AND EXITING THE DRIVEWAY. SIDEWALK SHED WAS NOT M 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39557250Y
ACTIVE
October 8, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBS. SUPPORTED SCAFFOLD AT EXP. 1, 2 & 3 NOT CONFORMING TO APPR. CD. OUTRIGGERS INSTALLED W/4 FT OUTREACH VS. APPR. 2 FT. BETA MAX 1,200-LB HOISTS USED WHERE 1,000-LB HOISTS WERE APPR. MASONRY FRAMES/4 FT FRAME 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557253J
ACTIVE
October 8, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 3314.4.4.5 OBS. ACCUM. CONSTR. DEBRIS & LOOSE MATERIALS STORED ON SUPPORTED SCAFFOLD PLATFORM. DEBRIS REDUCED USABLE WALKING/WORKING SURFACE AND CREATED TRIP HAZARDS FOR WORKERS. SUPPORTED SCAFFOLD WAS NOT MAI 2P7
39557257R
ACTIVE
October 8, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 OBS. TEMP CONSTR. FENCE INSTALLED ALONG ACTIVE DRIVEWAY WAS NOT PAINTED HUNTER GREEN AND LACKED REQ'D VIEWING PORTS. FENCE DID NOT CONFORM TO APPROVED TEMPORARY PROTECTION REQUIREMENTS, OBSTRUCTED VISIBILITY FO 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557251X
ACTIVE
October 8, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBS. SIDEWALK SHED NOT CONFORMING TO APPROVED DWGS. DEBRIS/MATERIALS INCL. SCAFFOLD SHANTY STORED ON TOP OF SHED AT EXP. 2. SHED MISSING REQ'D X-BRACES/BAYS AND RT. ANGLE PIPE CLAMPS; SEVERAL SHED POSTS OBSERVE 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557255N
ACTIVE
October 8, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 OBS. INADEQ. HOUSEKEEPING THROUGHOUT SIDEWALK SHED. CONSTR. DEBRIS, REFUSE, LOOSE MATS., SCAFFOLD COMPONENTS, MASONRY UNITS, PALLETS, TOOLS & STORED MATERIALS ACCUM. ON WALKING/WORKING SURFACES AND ACCESS WAYS, 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
39557258Z
ACTIVE
October 8, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 3307.6.4.2.2 AT TIME OF INSPECTION, SIDEWALK SHED AT EXPOSURE #2 OBSERVED BEING USED FOR STORAGE OF MATERIALS, DEBRIS, AND EQUIPMENT,SHANTY INCLUDING ON TOP OF SHED ROOF. STORAGE NOT IN DESIGNATED AREA AND CONT 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 9 summons records for this property identifier. The charge mix is: 6 Sidewalk Shed / Scaffold summonses; 3 Work Without a Permit summonses. The hearing date is October 8, 2026; the source issue date(s) are July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39557249R

CLASS - 1 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS HYDRAULIC PUMP JACKS/SHORING POSTS SUPPORTING A TEMPORARY FREESTANDING FLOOR/STRUCTURAL ASSEMBLY NOT INDICATED ON THE DOB APPROVED PLANS.TEMP SUPPORT INSTALLATION WAS ERECTED&MAINTAINED WITHOUT APPROVED ENG

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557252H

CLASS - 1 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3301.6.4 OBS. MAKESHIFT WORK PLATFORMS CONSTRUCTED OF WOOD PLANKS SUPPORTED BY STRUCTURAL STEEL/SCAFFOLD MEMBERS. PLATFORM INSTALLATION DID NOT CONFORM TO APPROVED CONSTR. DOCS.; APPROVED SCAFFOLD COMPONENTS A

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557256P

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS. SIDEWALK SHED POSTS WITHIN AN ACTIVE VEHICULAR DRIVEWAY LACKED REQ'D HIGH VISIBILITY MARKINGS. UNMARKED POSTS CREATED AN IMPACT HAZARD TO VEHICLES ENTERING AND EXITING THE DRIVEWAY. SIDEWALK SHED WAS NOT M

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39557250Y

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS. SUPPORTED SCAFFOLD AT EXP. 1, 2 & 3 NOT CONFORMING TO APPR. CD. OUTRIGGERS INSTALLED W/4 FT OUTREACH VS. APPR. 2 FT. BETA MAX 1,200-LB HOISTS USED WHERE 1,000-LB HOISTS WERE APPR. MASONRY FRAMES/4 FT FRAME

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557253J

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3314.4.4.5 OBS. ACCUM. CONSTR. DEBRIS & LOOSE MATERIALS STORED ON SUPPORTED SCAFFOLD PLATFORM. DEBRIS REDUCED USABLE WALKING/WORKING SURFACE AND CREATED TRIP HAZARDS FOR WORKERS. SUPPORTED SCAFFOLD WAS NOT MAI

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557257R

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS. TEMP CONSTR. FENCE INSTALLED ALONG ACTIVE DRIVEWAY WAS NOT PAINTED HUNTER GREEN AND LACKED REQ'D VIEWING PORTS. FENCE DID NOT CONFORM TO APPROVED TEMPORARY PROTECTION REQUIREMENTS, OBSTRUCTED VISIBILITY FO

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39557251X

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS. SIDEWALK SHED NOT CONFORMING TO APPROVED DWGS. DEBRIS/MATERIALS INCL. SCAFFOLD SHANTY STORED ON TOP OF SHED AT EXP. 2. SHED MISSING REQ'D X-BRACES/BAYS AND RT. ANGLE PIPE CLAMPS; SEVERAL SHED POSTS OBSERVE

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557255N

CLASS - 1 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS. INADEQ. HOUSEKEEPING THROUGHOUT SIDEWALK SHED. CONSTR. DEBRIS, REFUSE, LOOSE MATS., SCAFFOLD COMPONENTS, MASONRY UNITS, PALLETS, TOOLS & STORED MATERIALS ACCUM. ON WALKING/WORKING SURFACES AND ACCESS WAYS,

Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557258Z

CLASS - 2 · Issued July 29, 2026; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3307.6.4.2.2 AT TIME OF INSPECTION, SIDEWALK SHED AT EXPOSURE #2 OBSERVED BEING USED FOR STORAGE OF MATERIALS, DEBRIS, AND EQUIPMENT,SHANTY INCLUDING ON TOP OF SHED ROOF. STORAGE NOT IN DESIGNATED AREA AND CONT

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 9 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.