What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; 2 Sidewalk Shed / Scaffold summonses. The hearing date is October 1, 2026; the source issue date(s) are July 27, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39557102M
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBS@ ROOF PERIMETER @EXPO#1&3WORK AREA WITH OPEN LEADING EDGE LACKING REQUIRED GUARDRAIL PROTECTION. NO TOP RAIL, MIDRAIL, OR EQUIVALENT FALL PROTECTION WAS PROVIDED WHERE WORKERS COULD BE EXPOSED TO A FALL HAZ
Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Site Safety / Safeguarding — Summons 39557100Z
CLASS - 2 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED MAKESHIFT ELEVATED WOOD PLATFORMS, TEMPORARY STAIR TOWER AND HOISTING PULLEY SYSTEM IN USE. REQUIRED APPROVED DRAWINGS AND ENGINEERING DOCUMENTS FOR THE PLATFORMS, STAIR TOWER, PULLEY SYSTEM AND STRUCT
Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Sidewalk Shed / Scaffold — Summons 39557103Y
CLASS - 2 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBS WORKER USING A SUPPORTED SCAFFOLD ON AN ACTIVE CONSTRUCTION SITE. UPON REQUEST, NO VALID SUPPORTED SCAFFOLD USER TRAINING CERTIFICATES WERE PROVIDED FOR WORKERS USING THE SCAFFOLD. FAILURE TO MAINTAIN REQUI
Cited provision(s): 2G3 — BC 3314.4.6 (2008 CODE) & BC 3314.4.5.8 (2014 CODE) SCAFFOLD TRAINING CERTIFICATE CARD NOT READILY AVAILABLE FOR INSPECTIO
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Sidewalk Shed / Scaffold — Summons 39557104X
CLASS - 2 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: 3314.1 OBSERVED SUPPORTED SCAFFOLD ERECTED AND IN USE WITHOUT A COMPLETE GUARDRAIL SYSTEM OR TOE BOARDS. SEVERAL SCAFFOLD LEGS WERE NOT PROVIDED WITH REQUIRED BASE PLATES. SCAFFOLD PLATFORMS WERE USED TO STORE
Cited provision(s): 2P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.