What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 10 summons records for this property identifier. The charge mix is: 4 Other Building / Code Compliance summonses; 3 Work Without a Permit summonses; Illegal Occupancy / Conversion; Egress / Exit Obstruction; Certificate of Correction / Commissioner Order. The hearing dates are October 1, 2026, October 13, 2026, October 15, 2026; the source issue date(s) are July 27, 2026, June 12, 2026, November 25, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Other Building / Code Compliance — Summons 35729170R
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIALPURPOSES DEPARTMENT OF BUILDINGS RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED AS CLASS A MULTIPLE DWELLUNG AT FRONT APARTMENT ILLEGAL O
Cited provision(s): 1E5 — AC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE; 1E6 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.3
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 35729171Z
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 907.2.8 FAILURE TO PROVIDE CLASS J FIRE ALARM SYSTEM FOR TRANSIENT USE AT UNITS#101,201,301,401 AND 501 PROVIDE ECB#35727913J,35720145Y,35719586L,35675802Y.REM:DISCONTINUE ILLEGAL OCCUPANCY.
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Illegal Occupancy / Conversion — Summons 35729172K
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDING RECORDS.ILLEGAL OCCUPANCY NOTED:AT THE DUPLEX RECREATIONAL SPACE ON CELAR LEVEL AND 1ST FLOOR HAS BEEN QUARTED AS ADDITIONAL UNIT(UNIT#101)AND OCCUPIED
Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Work Without a Permit — Summons 35729173M
CLASS - 2 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT.WORK NOTED AT 1ST FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE A BEDROOM IN UNIT#101.REM:OBTAIN REQUIRED PERMIT
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 35729174Y
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT.WORK NOTED:AT UNIT#101 INSTALLED WATER AND WASTELINE FOR 3 PCS BATHROOM(TOILET,SINK,SHOWER),INSTALLED GAS LINE FOR KITCHEN STOVE.REM:OBTAIN REQUIRED PERMIT.
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 35729425J
CLASS - 2 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT.WORK NOTED AT UNIT#101 HAS BEEN INSTALLED ELECTRICAL LINES FOR LIGHTS SWITCHES AND OUTLET FOR THE BEDROOM AT 1ST FLOORAND BATHROOM AT 1ST FLOOR.REM:OBTAIN REQUIRED PERMIT.
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Egress / Exit Obstruction — Summons 35729426L
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.NOTED:AT STAIRCASE B FLOOR 2ND,4TH AND 6TH AND AT STAIRCASE C FLOOR 1ST AND 5TH(INTERNAL STAIRCASE)HAS BEEN OBSTRUCTED PART WAY BY CONSTRUCTION MATERIAL.REM:REMOV
Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Other Building / Code Compliance — Summons 35729427N
CLASS - 1 · Issued July 27, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: 28-915.10,BC 715.1 FAILURE TO COMPLY WITH OPENING PROTECTIVES.NOTED:AT1ST FLOOR STAIRCASE B HAS BEEN INSTALLED DOOR WITHOUT HARDWARE THAT RETURN THE DOOR IN CLOSED POSITION.REM:COMPLY WITH CODE.
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Certificate of Correction / Commissioner Order — Summons 35720551J
CLASS - 1 · Issued November 25, 2025; hearing October 13, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FILED A CERTIFICATE OF CORRECTION OR OTHER RELATED MATERIALS CONTAINING MATERIAL FALSE STATEMENT(S). VIOLATING CONDITIONS FOR C OF C FILED ON 11/25/25 FOR ECB #35719585J ARE STILL ACTIVE AT THE PREMISES. VIOLAT
Cited provision(s): 188 — 28-211.1 FILED A CERTIFICATE OF CORRECTION OR OTHER RELATED MATERIALS CONTAININ
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Other Building / Code Compliance — Summons 35727914L
CLASS - 1 · Issued June 12, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: PERMANENT DWELLING OFFERED/USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIAL PURPOSES. DOB RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED AS A CLASS "A" MULTIPLE DWELLING. NOW UNIT #302 ON 3RD FLOOR IS BEI
Cited provision(s): 1E5 — AC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE; 1E6 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.3
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 10 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.