BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1048915

Manhattan property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 27, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughManhattan
BIN1048915
Block / Lot01538 / 0001
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039139029N (source ECB number 39139029N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39139020R
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,530.00 OBSERVED DEMO WORK THROUGHOUT COMMERCIAL SPACE 1ST FLOORS UNDER PARTIAL DEMOLITION WITHOUT APPROVED PLANS, PE SHOP DRAWINGS. FAILURE TO PROVIDE APPROVED PLANS AND/OR PE REVISED DRAWINGS CREATES UNSAFE CONDITION 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39139023M
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $1,630.00 ATOI OBSERVED UNSUITABLE, ELECTRICAL CONDITIONS CREATING A POTENTIAL ELECTRICAL HAZARD, UNSAFE UNSUITABLE NON-CODE COMPLIANT ELECTRICALWORK. OPEN CONDUCTORS AND EXPOSED WIRING.PANELS WITHOUT COVERS, USED OF TEM 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39139026H
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $1,630.00 ATOI ON AN ACTIVE JOBSITE, OBSERVED ELECTRICAL WORK/DEMO BEING DONE THROUGHOUT 1ST FLOOR COMMERCIAL SPACE. UPON REVIEWING. AND DOING A SEARCH ON BIS/DOB NOW REVEAL TO ME THAT NO PERMIT WAS ISSUED FOR ELECTRICAL 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39139029N
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $4,830.00 ATOI ON A ACTIVE JOBSITE, OBSERVED UNLICENSED ELECT DEMO BEING PERFORM 3 WORKERS NAME,KEV RONCANO/JUAN PACA/LUIS YANZA&ANOTHER WORKER NOT NAMED INFORM ME THAT THEY ALL WORK FOR CJS INDUSTRIES INC,WHO IS NOT AN 1C7 — 27-3017 PERFORM UNLICENSED ELECTRICAL WORK

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Electrical Work / Electrical Permit; Work Without a Permit; Other Building / Code Compliance. The hearing date is October 27, 2026; the source issue date(s) are February 20, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39139020R

CLASS - 1 · Issued February 20, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED DEMO WORK THROUGHOUT COMMERCIAL SPACE 1ST FLOORS UNDER PARTIAL DEMOLITION WITHOUT APPROVED PLANS, PE SHOP DRAWINGS. FAILURE TO PROVIDE APPROVED PLANS AND/OR PE REVISED DRAWINGS CREATES UNSAFE CONDITION

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Electrical Work / Electrical Permit — Summons 39139023M

CLASS - 1 · Issued February 20, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNSUITABLE, ELECTRICAL CONDITIONS CREATING A POTENTIAL ELECTRICAL HAZARD, UNSAFE UNSUITABLE NON-CODE COMPLIANT ELECTRICALWORK. OPEN CONDUCTORS AND EXPOSED WIRING.PANELS WITHOUT COVERS, USED OF TEM

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Work Without a Permit — Summons 39139026H

CLASS - 1 · Issued February 20, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI ON AN ACTIVE JOBSITE, OBSERVED ELECTRICAL WORK/DEMO BEING DONE THROUGHOUT 1ST FLOOR COMMERCIAL SPACE. UPON REVIEWING. AND DOING A SEARCH ON BIS/DOB NOW REVEAL TO ME THAT NO PERMIT WAS ISSUED FOR ELECTRICAL

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 39139029N

CLASS - 1 · Issued February 20, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI ON A ACTIVE JOBSITE, OBSERVED UNLICENSED ELECT DEMO BEING PERFORM 3 WORKERS NAME,KEV RONCANO/JUAN PACA/LUIS YANZA&ANOTHER WORKER NOT NAMED INFORM ME THAT THEY ALL WORK FOR CJS INDUSTRIES INC,WHO IS NOT AN

Cited provision(s): 1C7 — 27-3017 PERFORM UNLICENSED ELECTRICAL WORK

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.