What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Façade / Exterior Wall; Sidewalk Shed / Scaffold. The hearing dates are October 1, 2026, October 8, 2026; the source issue date(s) are April 20, 2026, July 30, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Façade / Exterior Wall — Summons 37036504Z
CLASS - 2 · Issued April 20, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6, 7A, AND 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORTREQUIRED BY 28-302.5 FOR CONTROL #811979. AGG1: PRIOR NOV 37026187P UN
Cited provision(s): 227 — 28-302.5 FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT INDICA
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Sidewalk Shed / Scaffold — Summons 39557276M
CLASS - 2 · Issued July 30, 2026; hearing October 8, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION OF 6 STORY BUILDING OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED CAUSING HAZARDOUS CONDITIONS 1. MISSING VANDAL PROOF LIGHT FIXTURE 2 CONDUIT CONNECTED WITH PAINTERS TAPE/ NOT SECURE 3.
Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review