October 2026 NYC DOB / OATH Hearing — BIN 1051620

Manhattan property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 1, 2026, October 15, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughManhattan
BIN1051620
Block / Lot01616 / 0039
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039538892M (source ECB number 39538892M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39538892M
ACTIVE
October 1, 2026
9:00 AM
CLASS - 2 DEFAULT $6,250.00 AT TIME OF INSPECTION OF A 6-STORY MIX USE BUILDING, I OBSERVED NO SIGN OF CONSTRUCTION ACTIVITIES SIDEWALK SHED ERECTED EXP#1.UPON REVIEWING DOB NOW AND BIS SYSTEM SHOW SIDEWALK SHED PERMIT SINCE 03/08/2024 AN 2P8
39538893Y
ACTIVE
October 1, 2026
9:00 AM
CLASS - 2 DEFAULT $10,000.00 AT TIME OF INSPECTION OF A 6-STORY MIS USE BUILDING, I OBSERVED NO CONSTRUCTION ACTIVITIES, SIDEWALK SHED ERECTED EXPOSURE#1.DURING MY INSPECTION I NOTICED SIDEWALK SHED NOT MAINTAIN AS PER CODE 3307.6.4.10 FOU 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39544184M
ACTIVE
October 15, 2026
9:00 AM
CLASS - 2 DEFAULT $10,000.00 AT TIME OF INSPECTION OF 8 STORY MIXED USE BUILDING OBSERVED SIDEWALKSHED IN PLACE NOT MAINTAINED PER CODE 1. MISSING MUDSILLS 2. MISSING VANDAL PROOF FIXTURE CAUSING HAZARDOUS CONDITIONSMAINTAIN 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 3 Sidewalk Shed / Scaffold summonses. The hearing dates are October 1, 2026, October 15, 2026; the source issue date(s) are April 9, 2025, August 28, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39538892M

CLASS - 2 · Issued April 9, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION OF A 6-STORY MIX USE BUILDING, I OBSERVED NO SIGN OF CONSTRUCTION ACTIVITIES SIDEWALK SHED ERECTED EXP#1.UPON REVIEWING DOB NOW AND BIS SYSTEM SHOW SIDEWALK SHED PERMIT SINCE 03/08/2024 AN

Cited provision(s): 2P8

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39538893Y

CLASS - 2 · Issued April 9, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION OF A 6-STORY MIS USE BUILDING, I OBSERVED NO CONSTRUCTION ACTIVITIES, SIDEWALK SHED ERECTED EXPOSURE#1.DURING MY INSPECTION I NOTICED SIDEWALK SHED NOT MAINTAIN AS PER CODE 3307.6.4.10 FOU

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39544184M

CLASS - 2 · Issued August 28, 2025; hearing October 15, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION OF 8 STORY MIXED USE BUILDING OBSERVED SIDEWALKSHED IN PLACE NOT MAINTAINED PER CODE 1. MISSING MUDSILLS 2. MISSING VANDAL PROOF FIXTURE CAUSING HAZARDOUS CONDITIONSMAINTAIN

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.