BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1053660

Manhattan property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Electrical Work / Electrical Permit

BoroughManhattan
BIN1053660
Block / Lot01725 / 0069
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039197216Y (source ECB number 39197216Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39197204R
ACTIVE
October 1, 2026
10:30 AM
CLASS - 1 PENDING $1,600.00 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED IN APT 4B EXTENSION CORD BEING USED TO POWER A CEILING FIXTURE ALSO IN THE BASEMENT FLEX C 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39197218H
ACTIVE
October 1, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVED SEVERAL CRACKS AND HOLES THROUGHOUT CELLAR CEILING , ALSO I OBSERVED BULKHEAD HAS EXCESSIVE WATER DAMAGE AND PARAPET AT ROOF LEVEL IN DISRE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39197226H
ACTIVE
October 1, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED UNPERMITTED 2 PIECE BATH IN BASEMENT. PER PC 106.1 - PLUMBING WORK, INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES PERMITS, OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39197205Z
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $4,800.00 FAILURE TO GROUND ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT NO INSTALLATION OF ELECTRODE GROUND ROD INSTALLED ALSO THE MAIN HOUSE WATER GROUND CLAMP IS RUSTED AND STARTING TO OXIDIZE. POTENTINAL LOST OF CONT 1D7 — EC 250.4 FAILURE TO GROUND ELECTRICAL SYSTEMS.
39197203P
ACTIVE
October 1, 2026
9:30 AM
CLASS - 2 PENDING $500.00 FAILURE TO PROVIDE/MAINTAIN SUFFICIENT ACCESS/WORK SPACE ABOUT ELECTRICAL EQUIPMENT. OBSERVED IN THE BASEMENT THE ELECTRICAL MAIN SERVICE IS BLOCKED BY CARBOARD BOXES , TRASH BAGS MILK CRATES COMBUSTIBLE MATERI 2D3 — EC 110.26 FAILURE TO PROVIDE/MAINTAIN ACCESS/WORK SPACE ABOUT ELEC. EQUIP
39197216Y
ACTIVE
October 1, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. ATOI I OBSERVED A SCAFFOLD HAS BEEN ERECTED AT EXPOSURE 2 BLOCKING EGRESS AND FIRE ESCAPE LADDER FROM COMING DOWN PRODUCING A POTENTIAL HAZARDOUS CONDITION TO TE 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
39197225X
ACTIVE
October 1, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED IN GAS METER ROOM USED FOR STORAGE ALSO. APT 4B STOVE TAGGED. NOT WORKING PROPERLY PERB183 CLASS 1 BC 303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT PER B102 28-301.1 FAILU 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 2 Electrical Work / Electrical Permit summonses; 2 Failure to Maintain summonses; Work Without a Permit; Other Building / Code Compliance; Sidewalk Shed / Scaffold. The hearing date is October 1, 2026; the source issue date(s) are July 22, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39197204R

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED IN APT 4B EXTENSION CORD BEING USED TO POWER A CEILING FIXTURE ALSO IN THE BASEMENT FLEX C

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Failure to Maintain — Summons 39197218H

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVED SEVERAL CRACKS AND HOLES THROUGHOUT CELLAR CEILING , ALSO I OBSERVED BULKHEAD HAS EXCESSIVE WATER DAMAGE AND PARAPET AT ROOF LEVEL IN DISRE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39197226H

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNPERMITTED 2 PIECE BATH IN BASEMENT. PER PC 106.1 - PLUMBING WORK, INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES PERMITS, OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 39197205Z

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO GROUND ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT NO INSTALLATION OF ELECTRODE GROUND ROD INSTALLED ALSO THE MAIN HOUSE WATER GROUND CLAMP IS RUSTED AND STARTING TO OXIDIZE. POTENTINAL LOST OF CONT

Cited provision(s): 1D7 — EC 250.4 FAILURE TO GROUND ELECTRICAL SYSTEMS.

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Electrical Work / Electrical Permit — Summons 39197203P

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE/MAINTAIN SUFFICIENT ACCESS/WORK SPACE ABOUT ELECTRICAL EQUIPMENT. OBSERVED IN THE BASEMENT THE ELECTRICAL MAIN SERVICE IS BLOCKED BY CARBOARD BOXES , TRASH BAGS MILK CRATES COMBUSTIBLE MATERI

Cited provision(s): 2D3 — EC 110.26 FAILURE TO PROVIDE/MAINTAIN ACCESS/WORK SPACE ABOUT ELEC. EQUIP

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Sidewalk Shed / Scaffold — Summons 39197216Y

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. ATOI I OBSERVED A SCAFFOLD HAS BEEN ERECTED AT EXPOSURE 2 BLOCKING EGRESS AND FIRE ESCAPE LADDER FROM COMING DOWN PRODUCING A POTENTIAL HAZARDOUS CONDITION TO TE

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Failure to Maintain — Summons 39197225X

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED IN GAS METER ROOM USED FOR STORAGE ALSO. APT 4B STOVE TAGGED. NOT WORKING PROPERLY PERB183 CLASS 1 BC 303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT PER B102 28-301.1 FAILU

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.