This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses. The hearing date is October 1, 2026; the source issue date(s) are May 13, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Sidewalk Shed / Scaffold — Summons 35726212M
CLASS - 2 · Issued May 13, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: TEMPORARY CONSTRUCTION EQUIPMENT SIDEWALK SHED EXPIRED PERMIT. AS OF TODAY 05/13/2026 PERMIT #M00603792-I1-SH EXPIRED ON 03/31/2026. NO CURRENT PERMIT POSTED OR ON FILE. REMEDY: RENEW PERMIT.
Cited provision(s): 2P8
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Sidewalk Shed / Scaffold — Summons 35726213Y
CLASS - 1 · Issued May 13, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ERECTED OF INSTALLED SUPPORTED SCAFFOLD 40 FEET OR HIGHER WITHOUT A PERMIT. AS OF TODAY 05/13/2026 NO SUPPORTED ON FILE OR POSTED. REMEDY: OBTAIN A PERMIT.
Cited provision(s): 130 — BC 3314.2,27-1042 ERECTED OR INSTALLED SUPPORTED SCAFFOLD 40 FEET OR HIGHER WITHOUT A PE
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.