BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1062489

Manhattan property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 1, 2026, October 8, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Elevator / Vertical Transportation

BoroughManhattan
BIN1062489
Block / Lot02107 / 0020
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035717938R (source ECB number 35717938R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39197120J
ACTIVE
October 1, 2026
9:30 AM
CLASS - 1 PENDING $1,250.00 CLASS1 ITEM: DEVICE WAS FOUND OUT OF SERVICE. RESTORE TO SERVICE IMMEDIATLY. CONTACTNYC DOB@[email protected] FOR A COMPLETE INSPECTION: MAINTAIN 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
35717938R
ACTIVE
October 8, 2026
8:30 AM
CLASS - 1 PENDING $25,000.00 FAILURE TO MAINTAIN EXTERIOR BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AT EXP#1 WEST ELEVATION DAMAGED DECORATIVE CORNICE AND VERTICAL CRACKED AT BRICKWORK,AS OBSERVED AT EXP#2 NORT 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Façade / Exterior Wall. The hearing dates are October 1, 2026, October 8, 2026; the source issue date(s) are July 22, 2026, October 6, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Elevator / Vertical Transportation — Summons 39197120J

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: CLASS1 ITEM: DEVICE WAS FOUND OUT OF SERVICE. RESTORE TO SERVICE IMMEDIATLY. CONTACTNYC DOB@[email protected] FOR A COMPLETE INSPECTION: MAINTAIN

Cited provision(s): 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME

How this type of condition is typically resolved

Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.

Hearing issues to verify

  • Does the device number/location on the summons match the building's elevator record?
  • Was the cited defect repaired or the device removed from service before the inspection?
  • Were the required CAT/periodic inspection filings timely and accepted?

Evidence that may matter

  • Elevator device record and inspection/test reports
  • Maintenance contractor logs and repair tickets
  • Affirmation of Correction / reinspection result
  • Photographs or controller/service records

Façade / Exterior Wall — Summons 35717938R

CLASS - 1 · Issued October 6, 2025; hearing October 8, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN EXTERIOR BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AT EXP#1 WEST ELEVATION DAMAGED DECORATIVE CORNICE AND VERTICAL CRACKED AT BRICKWORK,AS OBSERVED AT EXP#2 NORT

Cited provision(s): 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.