What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Façade / Exterior Wall summonses. The hearing date is October 15, 2026; the source issue date(s) are August 6, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Façade / Exterior Wall — Summons 39557617L
CLASS - 1 · Issued August 6, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION OF 6 STORY FACADE JOB OBSERVED WORKERS UNSAFELY WORKING OVER FRONT ENTRANCE NOT TIED OFF, NO SAFE PLATFORM PROVIDED FOR SAFE WORK AREA AND NO PROTECTION FOR PUBLIC CREATING HAZARDOUS CONDI
Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Façade / Exterior Wall — Summons 39557618N
CLASS - 2 · Issued August 6, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION OF 6 STORY FACADE JOB OBSERVED C-HOOKS IN PLACE WITH PLATFORMS AND MOTORS ATTACHED WITHOUT NOTIFICATION TO DEPARTMENT OF SUCH ACTIVITY CREATING HAZARDOUS CONDITIONS. PROVIDE ALL LETTERS, D
Cited provision(s): 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review