BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1064943

Manhattan property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 22, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Electrical Work / Electrical Permit

BoroughManhattan
BIN1064943
Block / Lot02237 / 0043
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200695P (source ECB number 39200695P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39200694N
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $1,600.00 ATOI AT BASEMENT OBSERVED UNSAFE ELECTRICAL WIRING AND CONNECTIONS SERVING THE 220V CLOTHING DRYER. THE OUTLET IS IMPROPERLY ATTACHED TO THE WALL USING WOOD, AND LIVE ELECTRICAL WIRES ARE EXPOSED. THIS CONDITIO 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39200695P
ACTIVE
October 22, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED PIPING PENETRATIONS IN THE BASEMENT WITH MISSING REQUIRED FIRESTOPPING. IN ADDITION, THE BOILER ROOM DOOR/WALL FIRE-RATED CONTINUATION IS INCOMPLETE, WHICH COMPROMISES THE FIRE PROTECTION AND FIRE 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Boiler / HVAC / Service Equipment. The hearing date is October 22, 2026; the source issue date(s) are August 14, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39200694N

CLASS - 1 · Issued August 14, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI AT BASEMENT OBSERVED UNSAFE ELECTRICAL WIRING AND CONNECTIONS SERVING THE 220V CLOTHING DRYER. THE OUTLET IS IMPROPERLY ATTACHED TO THE WALL USING WOOD, AND LIVE ELECTRICAL WIRES ARE EXPOSED. THIS CONDITIO

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Boiler / HVAC / Service Equipment — Summons 39200695P

CLASS - 1 · Issued August 14, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED PIPING PENETRATIONS IN THE BASEMENT WITH MISSING REQUIRED FIRESTOPPING. IN ADDITION, THE BOILER ROOM DOOR/WALL FIRE-RATED CONTINUATION IS INCOMPLETE, WHICH COMPROMISES THE FIRE PROTECTION AND FIRE

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.